Monday, July 20, 2020



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

1000-1200

BTS Time of Arrival detector software

Pietryla

Limited Injection

1000-1200

ACIS validate EMI power supply

RF Group

No beam

1000-1200

Replace CPU in IOCS27FB. OPS to follow Power cycle instructions to recover

Shoaf

No beam

1200-1300

Test steering for 27-ID

Shang, Emery

Stored beam & Inj.

1300-1500

Linac training (07-15)

LaBuda/Kimbro

Limited Injection

1500-2000

Orbit switch to 24 singlets

Yipeng Sun

Stored beam & inj.

2000-2200

SR training (15-23)

Ronzhin/Berkland

Stored Beam and Injection

2200-2400

6 GeV setup (normal and special lattice with beta_y bump in Sector 25)

Emery, Sun, Calvey

Stored Beam & Inj.


Tuesday, July 21, 2020



0000-0400

6 GeV setup (normal and special lattice with beta_y bump in Sector 25) - continued

Emery, Sun, Calvey

Stored Beam & Inj.

0400-0600

SR training (23-07)

Weyer/Orne

Stored Beam and Injection

0700-0900

Linac training (07-15)

LaBuda/Kimbro

Limited Injection

0900-1100

measure P0FB and TFB response

Yao

Stored beam & inj.

1100-1400

test PTB-BooInj controllaw, (Fill 24 singlets for Sereno’s study)

Yao, Shang

Limited inj.

1100-1300

put bpms back into datapool and RTFB

Sereno

Stored beam

1400-1700

Booster chrom tuning study

Yao, Shang

No Stored beam

1600-1800

Set up for gas injection experiments

Harris/Calvey

Access Zone D

1800-2400

Gas injection study

Calvey, Emery, Hoyt

Stored beam & Inj.


Wednesday, July 22, 2020



0000-0200

Gas injection study(cont)

Calvey, Emery, Hoyt

Stored beam & Inj.

0200-0500

6 GeV instability thresholds

Emery

Stored beam & inj.

0500-0630

SR training (23-07)

Weyer/Orne

Stored Beam and Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection