Machine Studies
Draft Schedule for Run02-6, 2020
July 20th 0800 – July 22nd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 20, 2020 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
1000-1200 |
BTS Time of Arrival detector software |
Pietryla |
Limited Injection |
1000-1200 |
ACIS validate EMI power supply |
RF Group |
No beam |
1000-1200 |
Replace CPU in IOCS27FB. OPS to follow Power cycle instructions to recover |
Shoaf |
No beam |
1200-1300 |
Test steering for 27-ID |
Shang, Emery |
Stored beam & Inj. |
1300-1500 |
Linac training (07-15) |
LaBuda/Kimbro |
Limited Injection |
1500-2000 |
Orbit switch to 24 singlets |
Yipeng Sun |
Stored beam & inj. |
2000-2200 |
SR training (15-23) |
Ronzhin/Berkland |
Stored Beam and Injection |
2200-2400 |
6 GeV setup (normal and special lattice with beta_y bump in Sector 25) |
Emery, Sun, Calvey |
Stored Beam & Inj. |
|
Tuesday, July 21, 2020 |
|
|
0000-0400 |
6 GeV setup (normal and special lattice with beta_y bump in Sector 25) - continued |
Emery, Sun, Calvey |
Stored Beam & Inj. |
0400-0600 |
SR training (23-07) |
Weyer/Orne |
Stored Beam and Injection |
0700-0900 |
Linac training (07-15) |
LaBuda/Kimbro |
Limited Injection |
0900-1100 |
measure P0FB and TFB response |
Yao |
Stored beam & inj. |
1100-1400 |
test PTB-BooInj controllaw, (Fill 24 singlets for Sereno’s study) |
Yao, Shang |
Limited inj. |
1100-1300 |
put bpms back into datapool and RTFB |
Sereno |
Stored beam |
1400-1700 |
Booster chrom tuning study |
Yao, Shang |
No Stored beam |
1600-1800 |
Set up for gas injection experiments |
Harris/Calvey |
Access Zone D |
1800-2400 |
Gas injection study |
Calvey, Emery, Hoyt |
Stored beam & Inj. |
|
Wednesday, July 22, 2020 |
|
|
0000-0200 |
Gas injection study(cont) |
Calvey, Emery, Hoyt |
Stored beam & Inj. |
0200-0500 |
6 GeV instability thresholds |
Emery |
Stored beam & inj. |
0500-0630 |
SR training (23-07) |
Weyer/Orne |
Stored Beam and Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |