Draft Schedule for Run02-9, 2020
August 13th 0000 – August 13th 2400
Time |
Descriptions |
Studiers |
SR Status |
|
Thursday, August 13, 2020 |
|
|
0000-0010 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0010-0500 |
Sextupole offset measurement |
Sajaev |
Stored Beam & inj. |
0500-0700 |
Linac Console testing |
Kimbro, Fystro |
No injection |
0700-0900 |
Install and test a new database for vectorizing the BTS BPM readbacks |
Pietryla |
Limited injection |
0900-1100 |
Booster bpm checkout/BTS Beam arrival time checkout and realign S27ID:P1 GRID XBPM |
Sereno, Yang |
Stored Beam & Injection |
1100-1400 |
Continue Booster chromaticity optimization. Booster beam. Will change rf frequency |
Yao, Shang |
No Stored Beam |
1400-1800 |
6 GeV single bunch threshold |
Emery, Xiao |
Stored Beam & Inj. |
1800-2200 |
6 GeV and 7 GeV pinhole resolution measurement |
Emery, Xiao |
Stored Beam & Inj. |
2200-2400 |
"Gentle shutdown" of SR P.S. and RF |
MCR |
No Beam |