Machine Studies
Draft Schedule for Run03-3, 2020
October 19th 0800 – October 20th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 19, 2020 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1030 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
1030-1130 |
Reconfigure L3 PEM |
Dooling |
Limited Injection |
1030-1230 |
RF waveguide switch restore RF-3 |
RF Group |
No Beam |
1030-1230 |
Check Booster tune measurement system |
Yao |
Limited Injection |
1115-2200 |
19ID beam stop installation |
Vacuum Group |
Access Zone C |
1200-1400 |
Gas experiment measurements |
Gagliano |
Access Zone E |
1230-1400 |
Investigate L5 SLED water leak |
Wright |
Limited Injection |
1300-1400 |
Restore water to S25 GRID X |
Diagnostics |
Access Zone D |
1300-1500 |
PAR training |
Ronzhin/Kimbro |
Limited Injection |
1400-1600 |
Test S25 canted supplies |
Puttkammer |
No Beam |
1500-1700 |
Measuring linac energy on the FS10 screen |
Dooling |
Linac Beam |
1600-1700 |
Testing remote connection |
Huang |
No Beam |
2200-2230 |
SR recovery |
OPS |
Stored Beam & Injection |
2230-2400 |
Reboot S25 IOC and check P0/P1 BPM coefficients |
Sereno/Xu |
Stored Beam & Injection |
|
Tuesday, October 20, 2020 |
|
|
0000-0030 |
Reboot S25 IOC and check P0/P1 BPM coefficients |
Sereno/Xu |
Stored Beam & Injection |
0030-0130 |
Test new topup monitor PVs |
Sereno |
Stored Beam & Injection |
0130-0230 |
Test bpld validation script |
Sereno/Shang |
Stored Beam & Injection |
0230-0430 |
BTS response measurement |
Yao/Shang |
Booster Beam |
0430-0630 |
Booster chrom correction study |
Yao/Shang |
Booster Beam |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |