Machine Studies
Draft Schedule for Run03-6, 2020
November 9th 0800 – November 11th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 9, 2020 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
SR Gaps scans |
Hahne |
Stored Beam & Injection |
0930-1030 |
Troubleshoot intermittent PSS fault at RF-3 |
RF Group |
No Beam |
0930-1130 |
Replace EMI power supply at L3 |
RF Group |
No Injection |
1000-1100 |
NWM familiarization walkthrough |
Hayden |
Access Zone A |
1100-1200 |
Recover SR and Injectors |
Ops |
Stored Beam & Injection |
1200-1600 |
Hybrid setup |
Xiao |
Stored Beam & Injection |
1600-1800 |
P0 feedback setup |
Yao |
Stored Beam & Injection |
1800-2300 |
Orbit switch |
Y.P. Sun |
Stored Beam & Injection |
2300-2400 |
SR performance study |
Y.P. Sun |
Stored Beam & Injection |
|
Tuesday, November 10, 2020 |
|
|
0000-0200 |
SR performance study |
Y.P. Sun |
Stored Beam & Injection |
0200-0400 |
PAR training (23-07) |
Ronzhin/Kimbro |
Limited Injection |
0400-0800 |
IEX perturbation measurement |
Xiao |
Stored Beam & Injection |
0800-1200 |
Sextupole-based BPM offset measurement |
Sajaev |
Stored Beam |
08:15-1200 |
Troubleshoot PAR RF 12th harmonic (May impact studies following this one) |
Smith, et al |
No SR injection |
1200-1400 |
S27 Libera single bunch studies |
Sereno/Brill |
Stored Beam & Injection |
1400-1700 |
S27 Feedback controller step response measurements |
Sereno, et al. |
Stored Beam & Injection |
1700-1900 |
Check bunch purity |
Harkay |
Stored Beam & Inj. |
1900-2300 |
6 GeV instabilities |
Emery |
Stored Beam & Injection |
2300-2400 |
Measure MPS dump orbit signatures |
Emery |
Stored Beam & Injection |
|
Wednesday, November 11, 2020 |
|
|
0000-0100 |
6 GeV instabilities (continued) |
Emery |
Stored Beam & Injection |
0100-0300 |
PAR training (23-07) |
Ronzhin/Kimbro |
Limited Injection |
0300-0630 |
OPEN |
|
|
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |