Machine Studies

Draft Schedule for Run03-8, 2020

November 25th 0800 – November 27th 0800

 

Time

Descriptions

Studiers

SR Status

 

Wednesday, November 25, 2020

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

SR Gap scans

Hahne

Stored Beam & Injection

0930-1030

RF waveguide switch

RF Group

No Beam

0930-1130

Investigate communication loss S17

Puttkammer

No Beam

1030-1130

Test PAR RF-12 into cavity

T. Smith

Limited Injection

1030-1230

RF-3 water loop tuning

Swetin

Limited Injection

1130-1330

PAR training (07-15)

Kimbro/Ronzhin

Limited Injection

1230-1330

Investigate RF-5 filament OI interlock

RF Group

Limited Injection

1330-1400

SR recovery

OPS

Stored Beam & Injection

1400-1900

Orbit switch

Y.P. Sun

Stored Beam & Injection

1900-2200

6 GeV ID perturbation measurement

Emery

Stored Beam & Injection

2200-2300

SR Operator re-qualification

Davis/Schroeder

Stored Beam & Injection

2300-2400

SR Operator re-qualification

LaBuda/Schroeder

Stored Beam & Injection

 

Thursday, November 26, 2020

 

 

0000-0600

Testing IEX FF table

Xiao

Limited Injection

0000-0200

Booster TBT beam history

Yao

Limited Injection

0200-0600

Align booster sextupole timing and optimize injection

Yao

Limited Injection

0600-1400

APS-U timing set up

Wienands/CTLS

No Beam/Stored Beam & Injection but with altered timing

1400-1500

SR Operator re-qualification

Ronzhin/Schroeder

Stored Beam &  Injection

1500-1600

SR Operator re-qualification

Weyer/Schroeder

Stored Beam &  Injection

1600-2400

Mombo XBPM gap scan

Sereno

Stored Beam &  Injection

 

Friday, November 27, 2020

 

 

0000-0400

Injection optimization

Shang/Emery/Huang

Stored Beam &  Injection

0400-0630

SR optimization

Y.P. Sun

Stored Beam &  Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection