Machine Studies

Draft Schedule for Run03-9, 2020

December 7th 0800 – December 8th 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, December 7, 2020

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

SR Gaps scans

Hahne

Stored Beam & Injection

0930-1000

Reboot iocbtemp

Stevens

Limited Injection

0930-1130

Fix S16 communication problem

Puttkammer

No Beam

0930-1130

Pull ethernet cables from S2:3 to S4:5

PS Group

No Beam

0930-1130

Replace UVC touchscreen at RF-3

RF Group

No Beam

0930-1330

APS-U timing testing

Wienands/ et al

No Beam

0930-1330

Tunnel temperature sensor cabling

Erwin

No Beam

1330-1530

Booster BPM history study with rf frequency change

Yao/Shang

Limited Injection

1530-1600

SR recovery

OPS

Stored beam & Injection

1600-1700

Check P0 FB configuration

Yao

Stored beam & Injection

1700-2200

Orbit switch

Y.P. Sun

Stored beam & Injection

2200-2300

Operator re-qualification

Ronzhin/Schroeder

Stored beam & Injection

2300-2330

Operator re-qualification

Weyer/Schroeder

Stored beam & Injection

2330-2400

DA optimization study

Emery/Huang/Shang

Stored beam & Injection

 

Tuesday, December 8, 2020

 

 

0000-0330

DA optimization study

Emery/Huang/Shang

Stored beam & Injection

0330-0630

6 GeV ID FF table

Emery

Stored beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection