Draft Schedule for Run03-9, 2020
December 7th 0800 – December 8th 0800
Time | Descriptions | Studiers | SR Status |
| Monday, December 7, 2020 |
|
|
0800-0810 | Collect XBPM orbit data | OPS | Stored Beam & Injection |
0810-0930 | SR Gaps scans | Hahne | Stored Beam & Injection |
0930-1000 | Reboot iocbtemp | Stevens | Limited Injection |
0930-1130 | Fix S16 communication problem | Puttkammer | No Beam |
0930-1130 | Pull ethernet cables from S2:3 to S4:5 | PS Group | No Beam |
0930-1130 | Replace UVC touchscreen at RF-3 | RF Group | No Beam |
0930-1330 | APS-U timing testing | Wienands/ et al | No Beam |
0930-1330 | Tunnel temperature sensor cabling | Erwin | No Beam |
1330-1530 | Booster BPM history study with rf frequency change | Yao/Shang | Limited Injection |
1530-1600 | SR recovery | OPS | Stored beam & Injection |
1600-1700 | Check P0 FB configuration | Yao | Stored beam & Injection |
1700-2200 | Orbit switch | Y.P. Sun | Stored beam & Injection |
2200-2300 | Operator re-qualification | Ronzhin/Schroeder | Stored beam & Injection |
2300-2330 | Operator re-qualification | Weyer/Schroeder | Stored beam & Injection |
2330-2400 | DA optimization study | Emery/Huang/Shang | Stored beam & Injection |
| Tuesday, December 8, 2020 |
|
|
0000-0330 | DA optimization study | Emery/Huang/Shang | Stored beam & Injection |
0330-0630 | 6 GeV ID FF table | Emery | Stored beam & Injection |
0630-0800 | Prepare for User beam | OPS | Stored Beam & Injection |