Machine Studies

Draft Schedule for Run01-1, 2021

January 19th 0800 – January 26th 0800



Time

Descriptions

Studiers

SR Status


Monday, Jan. 18, 2021 - Prestudies



0700-0900

MPS Validations

Smith/Flood

No injection

0900-1000

Prepare SR for RF Conditioning with beam

Flood/OPS

Stored beam & inj.

1000-2400

RF Conditioning with Beam (24 singlets)

OPS

Stored beam & inj.

~1500

Pinhole camera initial set-up (current above 50mA) parallel to RF conditioning w/beam

Yang

Stored beam & inj.

~1700

BPM checkout (parallel to RF conditioning w/ beam

Sereno

Stored beam & inj.


Tuesday, January 19, 2021



0000-0800

RF Conditioning with beam

OPS

Stored beam & inj.

0800-1200

BPLD Validations

Sereno

Stored beam & inj.

1200-1400

X-BPM Sanity Check

Sereno

Stored beam & inj.

1400-2000

Lattice set-up

Xiao

Stored beam & inj.

2000-2400

Orbit recovery

Yipeng Sun

Stored beam & inj.


Wednesday, January 20, 2021



0000-0100

Orbit recovery (continued)

Yipeng Sun

Stored beam & inj.

0100-0700

RG1 conditioning

Yine Sun

No injection

0100-0700

CPU/IEX checkout

Xiao, OPS

Stored beam & occ. inj.

0700-0900

Test B3C2P1 and B3C2P2 BPMs after configuration change

Yao, Pietryla

Limited inj.

0900-1100

Booster singleTurn injection x-controllaw setup

Yao, Shang

Limited inj.

0900-1400

SR Lifetime study (parasitic to Booster studies)

Yipeng Sun

Stored beam & inj.

1100-1400

Booster chrom optimization with SD/SF new ramps.

Yao, Shang

Limited inj.

1400-1500

Operator requalification

Grodecki, Schroeder

Stored beam & inj.

1500-1700

Operator requalification

Smith, Schroeder

Stored beam & inj.

1700-1900

Booster tune-up

Calvey

Stored beam & inj.

1900-2300

Set-up optics correction for new 6 GeV lattice

Emery, Xiao

Stored beam & inj.

2300-2400

ID Steering & BPM offset measurement

Xiao

Stored beam & occ. inj.


Thursday, January 21, 2021



0000-0500

ID Steering & BPM offset measurement (continued)

Xiao

Stored beam & occ. inj.

0500-1030

RG1 beam in linac optimization

Yine Sun, Shang

No injection

0700-0800

Prepare for SR access

OPS

No beam

0800-0900

Check in-tunnel connections for S26B:P1

Blake

Access Zone D

1030-1130

BPLD Validation for 26B:P1 if needed

Sereno

Stored beam & inj.

1130-1300

Injector training

Kimbro, Grodecki

Limited inj.

1300-2300

Timing & synch test

Wienands, et al

Stored beam & inj.

2300-2400

Accumulation limit as a benchmark of performance (hybrid setup)

Xiao/Emery

Stored beam & inj.


Friday, January 22, 2021



0000-0500

Accumulation limit as a benchmark of performance (hybrid setup) (continued)

Xiao/Emery

Stored beam & inj.

0500-1100

RG1 beam lattice matching, PAR injection optimization, control law set up and beam stability measurements

Yine Sun, Fystro

No injection

1100-1300

testing booster x-injection controllaw with beam

Calvey, Fystro, Yao Shang

No injection

1300-1500

Injector training

Grodecki, Kimbro

Limited injection

1300-1500

SR Lifetime study

Yipeng Sun

Stored beam

1500-1700

Booster TBT history with rf ramp and Ext kicker as pinger

Yao

No injection

1700-1900

Check PC gun transmission through Linac

Dooling

No injection

1900-2300

optimize injection of the above 6 GeV lattice

Emery, Shang, Huang.

Stored beam & inj.

2300-2400

vertical scan of scraper for lifetime.

Emery

Stored beam & inj.


Saturday, January 23, 2021



0000-0100

vertical scan of scraper for lifetime.(continued)

Emery

Stored beam & inj.

0300-1000

Top-up verification (24 singlets,gaps closed, all controllaws running)

OPS

Stored beam & injection

1000-1600

CPU/IEX correction

Xiao

Stored beam & inj.

1600-2000

6GeV Undulator Perturbation

Emery

Stored beam & inj.

2000-2400

Top-up verification (24 singlets,gaps closed, all controllaws running) - 6 hours with interleaving

OPS/Dooling

Stored beam & inj.


Sunday, January 24, 2021



0000-1000

Top-up verification (continued)

OPS

Stored beam & inj.

1000-1500

6 GeV single bunch limit

Emery

Stored beam & inj.

1500-2000

Online optimization with TBT BPM

Yipeng Sun

Stored beam & inj

2000-2200

Abort kicker checkout

Harkay, Xiao

Stored beam & inj.

2200-2400

Final Optics Set-up

Xiao

Stored beam & Inj.


Monday, January 25, 2021



0000-0200

Final Optics Set-up (continued)

Xiao

Stored beam & Inj.

0300-0700

Sextupole offset measurements

Sajaev

Stored beam & inj.

0800-1200

7 GeV Dimtel feeback testing

Emery/Diag

Stored beam & inj.

1200-1400

P0 feedback

Yao

Stored beam & inj.

1400-1800

Final set-up of bunch purity monitor and pinhole camera

Yang

Stored beam & inj.

1800-2200

Final orbit set-up

Yipeng Sun

Stored beam & inj.

2200-2400

Bunch Purity checkout

Harkay, Yipeng Sun

Stored beam & inj.


Tuesday, January 26, 2021



0000-0630

OPEN



0630-0800

Prepare for User beam (no gaps closed)

OPS

Stored Beam & Injection