Machine Studies

Draft Schedule for Run01-3, 2021

February 8th 0800 – February 9th 0800

 

Time

Descriptions

Studiers

SR Status

 

Monday, February 8, 2021

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

Reboot 6ID MOXA

Smith

No Beam

0930-1130

Troubleshoot S6 canted supply issues

Jordan

No Beam

0930-1130

Replace +5v supplies (S8,9, 11)

Vargas/Vanis

No Beam

0930-1130

Fix exhaust fan in SR S7 converter cabinet 1

Meier

No Beam

1000-1100

PAR shielding mapping

Wienands, et al

Access PAR

1000-1100

ITS cable work

Meyer

Access ITS

1030-1100

Remove matching networks

Brill

Access Zone F

1030-1100

Check S38 cavity thermocouples

Wright

Access Zone F

1100-1200

Recover SR and injectors. Verify injection.

OPS

No Beam

1200-1230

Set up Dimtel in sectors 2 and 35

Brill

6 GeV Beam No Injection

1200-1230

Set up 6 GeV. Fill 324 bunches

Emery

Stored Beam & Injection

1230-1830  

RG1 study

Yine Shang Borland Fystro Huang

6 GeV Beam but no injection

1230-1630

6 GeV studies, ID perturbation

Emery Xiao

6 GeV Beam No Injection

1730-1830

Setup SR for 7 GeV. Test with injected beam a short time at 1830

Emery Xiao

No Beam & No Injection

1830-2130

Booster chromaticity. Vary rf frequency.

Yao Shang

No Beam & No Injection

2130-0130

Dimtel feedback sector 2. Check running sector 35 and 2 together as x and y planes.

Emery Kallakuri

Stored Beam & Injection

 

Tuesday, February 9, 2021

 

 

0130-0500

6 GeV studies, single bunch instability. Use Dimtel in both planes

Emery Xiao Kallakuri

6 GeV Beam & Injection

0500-0600

Connect P0 feedback, setup up for 7 GeV

Brill Emery

Stored Beam & Limited Injection

0500-0700

Booster training

Grodecki/Kimbro

Limited Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection