Machine Studies
Schedule for Run01-7, 2021
March 8th 0800 – March 10th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 8, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1030 |
RF waveguide switch |
RF Group |
No Beam or Injection |
1000-1200 |
Hi pot IS1 |
Wright |
Access Zone F |
1000-1100 |
Swap S37 blower |
Wright |
Access Zone F |
1030-1200 |
Install thermocouples on AM and BM magnets |
Erwin |
Access Zone A |
1200-1330 |
Recover SR system |
OPS |
Stored Beam & Injection |
1330-1800 |
Set up hybrid mode with Dimtel feedback |
Emery Xiao Kallakuri |
Stored Beam & Injection |
1800-2100 |
Booster SF/SD optimization with new ramps. Need change rf frequency |
Yao, Shang |
No Beam & Injection |
2100-2300 |
Booster training |
Grodecki/Kimbro |
Limited Injection |
2300-2400 |
Open |
|
Stored Beam & Injection |
|
Tuesday, March 9th, 2021 |
|
|
0000-0400 |
6 GeV Instabilities |
Emery |
Stored Beam & Injection |
0400-0900 |
Orbit Switch to Hybrid mode |
Yipeng |
Stored Beam & Injection |
0900-1300 |
Orbit to rf phase feedback experiment (contingent on a repair) |
Sereno Brill |
Stored Beam & Injection |
1300-1600 |
LB+ TBT DAQ injection studies. |
Sereno Brill |
Stored Beam & Injection |
1600-2000 |
Sextupole Optimization |
Huang, Shang, Emery |
Stored Beam & Injection |
2000-2200 |
Booster training (15-23) |
Grodecki/Kimbro |
Limited Injection |
2200-2400 |
Open |
|
Stored Beam & Injection |
|
Wednesday, March 10th, 2021 |
|
|
0000-0400 |
6 GeV Instabilities |
Emery |
Stored Beam & Injection |
0400-0630 |
Open |
|
|
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |