Machine Studies
Schedule for Run01-8, 2021
March 15th 0800 – March 16th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 15, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1030 |
Replace P0FB amplifier |
Zabel, Blake |
No Beam |
0930-1130 |
Troubleshoot RF-4 mod anode trips |
Trento |
No Beam |
1000-1200 |
Rearrange equipment in PAR RF rack |
Meyer |
No Injection |
1000-1200 |
PAR shielding planning |
Fystro, et al |
Access PAR |
1030-1130 |
Collimator and front end assessment |
Bechtold |
Authorized Access Zone B |
1100-1200 |
Collimator and front end assessment |
Bechtold |
Authorized Access Zone C |
1200-1330 |
Recover injector and SR systems |
OPS |
Stored Beam & Injection |
1330-2130 |
APS-U timing set up |
Wienands |
No Beam |
2130-2330 |
Test Booster single turn BPM new event. Can provide beam to SR |
Yao Pietryla |
Stored Beam & Injection |
2130-2400 |
Optimization of Sextupoles |
Emery Shang Huang |
Stored Beam & Injection |
|
Tuesday, March 16th, 2021 |
|
|
0000-0130 |
Optimization of Sextupoles |
Emery Shang Huang |
Stored Beam & Injection |
0130-0230 |
Check of injection and check on Dimtel for hybrid mode |
Emery |
Stored Beam & Injection |
0230-0430 |
Open |
|
Stored Beam & Injection |
0430-0630 |
Booster training (23-07) |
Grodecki/Kimbro |
Limited Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |