Machine Studies

Schedule for Run02-1, 2021 (includes Pre-studies)

May 24th  0800 – June 2nd 0800

Time

Descriptions

Studiers

SR Status

Monday, May 24, 2021 (Pre-Studies)

0700-0900

MPS validations

Smith/OPS

Stored beam & injection

0900-0000

Conditioning with beam (24 singlets)

OPS

Stored beam & injection

~1500

Pinhole camera initial set-up (current above 50 mA) parallel to RF conditioning w/beam

Yang

Stored beam & injection

~1700

BPM checkout (parallel to RF conditioning w/beam)

Sereno

Stored beam & injection

Tuesday, May 25, 2021

0000-0800

Conditioning with beam (24 singlets)

OPS

Stored beam & injection

0800-1300

(Added) Conditioning with beam (24 singlets)

OPS

Stored beam & injection

1300-1700

BPLD Validations

Hahne

Stored beam & injection

1700-1900

X-BPM Sanity Check

Hahne

Stored beam & injection

1900-2400

Lattice set-up

Xiao Sajaev

Stored beam & injection

2000-2400

Orbit recovery

Yipeng Sun

Stored beam & injection

Wednesday, May 26, 2021

0000-0100

Lattice set-up

Xiao Sajaev

Stored beam & injection

0000-0100

Orbit recovery

Yipeng Sun

Stored beam & injection

0100-0700

IEX/CPU checkout

OPS/Xiao

Stored beam & injection

0700-1000

Check and scan SR BPM singleTurn timing

Yao

Stored beam & injection

1000-1700

Accumulation limit as a benchmark of performance (hybrid setup)

Xiao

Stored beam & injection

1000-1700

Orbit recovery

Yipeng Sun

Stored beam & injection

1700-2100

Setup Dimtel boxes

Emery

Stored beam & injection

2100-2400

IEX/CPU checkout

OPS/Xiao

Stored beam & injection

Thursday, May 27, 2021

0000-0400

IEX/CPU checkout

OPS/Xiao

Stored beam & injection

0400-0800

Open

0800-1000

HET rad survey

Henry

Access Booster/ Stored Beam SR

0800-1100

Linac interleaving trigger validation

Pietryla

No Injection

0800-1100

Check 09ID PSS connection to PS2 shutter

Belcher

Zone B Access

1100-1200

Recover Booster/SR (324 fill)

OPS

Limited Injection

1200-1700

Booster cavity phasing/voltage verification

Calvey/RF group

Limited injection

1700-2100

Tune up RG2 beam (with RG1 alpha magnet off)

Yine Sun, Fystro

Stored beam

1200-2100

IEX/CPU correction

Xiao

Stored beam

2100-2400

Open

Friday, May 28, 2021

0000-0800

Open

0800-1100

BTS measurement

Xiao/Shang

No Injection

0800-1100

Investigation of RF5

RF group

No beam

1100-1700

6 GeV beam instability benchmarking

Emery

Stored beam & injection

1700-2400

Top-up verification (24 singlets,gaps closed, all controllaws running)

OPS

Stored beam & injection

1700-2300

Stored beam & injectionDoolingTest Interleaving mode with top-up running

Dooling

Stored beam & injection

1700-2400

Sector 35 gas injection HP surveys

Calvey/Hoyt/Heyek

Stored beam & injection

Saturday, May 29, 2021

0000-0100

Sector 35 gas injection HP surveys

Calvey/Hoyt/Heyek

Stored beam & injection

0000-0600

Top-up verification (24 singlets,gaps closed, all controllaws running)

OPS

Stored beam & injection

0600-1000

Various study

Xiao

Stored beam & injection

1000-1600

6 GeV beam instability benchmarking

Emery

Stored beam & injection

1600-2000

Sector 27 orbit feedback studies - test new controllers for 3x12 irm

Sereno, et al

Stored beam & injection

2000-2400

Put back BPMs to XRDP/DP

Sereno

Stored beam & injection

Sunday, May 30, 2021

0000-0800

Open

0800-1400

Test Booster chrom correction

Yao/Shang

Stored beam

1400-1600

Booster tune-up

Calvey

Limited injection

1600-1800

Examine why 180 phase shift is required in the FIR for 6 GeV operation

Emery

Stored beam & injection

1800-2200

6 GeV optimize kickers

Emery

Stored beam & injection

2200-2400

Open

Monday, May 31, 2021

0000-0600

Open

0600-1000

Final Lattice Setup

Xiao

Stored beam & injection

1000-1400

Low alpha lattice

Yipeng Sun, Huang

Stored beam & injection

1400-1800

Sextupole optimization

Emery/Huang/Shang

Stored beam & injection

1800-2400

Open

1800-2400

Top-up verification (24 singlets,gaps closed, all controllaws running)

OPS

Stored beam & injection

1800-2400

Test Interleaving mode with top-up running

Dooling

Stored beam & injection

Tuesday, June 1, 2021

0000-0800

Top-up verification (24 singlets,gaps closed, all controllaws running)

OPS

Stored beam & injection

0800-1200

Final set-up of bunch purity monitor and pinhole camera

Yang

Stored beam & injection

1200-1600

Final Lattice setup

Xiao

Stored beam & injection

1200-1600

Final orbit set-up

Yipeng Sun

Stored beam & injection

1600-1800

Bunch purity checkout

Yipeng Sun, Harkay

Stored beam & injection

1800-2000

Abort kicker checkout

Xiao/Harkay

Stored beam & injection

2000-2400

Open

Wednesday, June 2 2021

0000-0630

Open

0630-0800

Prepare for User beam

OPS

Stored beam & injection