Draft Schedule for Run02-11, 2021
Sept 6th 0800 – Sept 13th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, Sept 6, 2021 |
|
|
0800-1200 |
BPLD validations |
Hahne |
Stored Beam & Injection |
1200-1400 |
X-BPM sanity check |
Hahne |
Stored Beam & Injection |
1400-1500 |
Setup Dimtel timing |
Emery |
Stored Beam & Injection |
1500-2000 |
Lattice set up |
Xiao |
Stored Beam & Injection |
2000-2400 |
Orbit recovery |
Yipeng |
Stored Beam & Injection |
|
Tuesday, Sept 7, 2021 |
|
|
0000-0800 |
Accumulation limits checks |
Emery |
Stored Beam & Injection |
0800-1600 |
PAR loss scenarios |
Harkay, Henry, Micklich |
Limited Injection |
1600-2000 |
BTS response measurement. |
Yao Shang |
No SR beam |
2000-2400 |
PAR ion studies |
Calvey |
Stored Beam & Injection |
|
Wednesday, Sept 8, 2021 |
|
|
0000-0800 |
6 GeV lattice setup |
Emery |
Stored Beam & Injection |
0800-1000 |
Linac operator training (parasitic) |
LaBuda/Hotham |
Stored Beam & Injection |
0800-1200 |
Linac K2-down mode testing |
Yine, Pietryla, Meyer |
Stored Beam & Injection |
1200-1800 |
IEX/CPU setup (BTS charge monitor unavailable during portion of time) |
Xiao |
Stored Beam & Injection |
1300-1400 |
BTS current monitor noise |
Keane |
Stored Beam & Injection |
1800-2200 |
Booster tuning and orbit correction |
Calvey |
Limited Injection |
2200-2400 |
Open |
|
|
|
Thursday, Sept 9, 2021 |
|
|
0000-0600 |
Open |
|
|
0600-1600 |
IETS studies including booster cavity detunings |
Wienands, Fors, Horan, Nassiri |
|
0800-1000 |
Linac operator training (parasitic) |
LaBuda/Hotham |
Stored Beam & Injection |
1600-2000 |
6 GeV low-alpha lattice setup |
Sajaev, Emery |
Stored Beam & Injection |
2000-2400 |
Booster chrom correction study. Need change rf frequency. |
Yao, Shang |
No beam |
|
Friday, Sept 10, 2021 |
|
|
0000-0700 |
Open |
|
|
0700-0900 |
Linac operator training |
LaBuda/Hotham |
Stored Beam & Injection |
0700-0900 |
L5 water skid tuning |
Wright |
Limited Injection |
0900-1500 |
IEX/CPU setup |
Xiao |
Stored Beam & Injection |
1500-1700 |
Connect monitoring to RF-4 |
RF Group |
No Beam |
1500-1800 |
Access to adjust leak valves |
Hoyt |
Access Zone E |
1530-1630 |
Water Leak investigation |
MOM |
Access Zone A |
1800-2400 |
HP survey for 6 GeV gas injection |
Calvey, Hoyt, HP, Emery |
Stored Beam & Injection |
|
Saturday, Sept 11, 2021 |
|
|
0000-0800 |
Open |
|
|
0800-1200 |
S27 Orbit to RF phase feedback test with low alpha lattice |
Kallakuri, Sereno, Carwardine |
Stored Beam & Injection |
1200-1400 |
SR training |
Ronzhin/Kimbro |
Stored Beam & Injection |
1400-1600 |
BTS response measurement |
Yao, Shang |
No Beam |
1600-2000 |
BTS:FS3 YAG scintillator study |
Wootton, Berg, Lumpkin |
Stored Beam |
2000-2400 |
6 GeV Stability |
Emery |
Stored Beam & Injection |
|
Sunday, Sept 12, 2021 |
|
|
0000-0400 |
6 GeV Stability |
Emery |
Stored Beam & Injection |
0400-0600 |
Open |
|
|
0600-0800 |
Abort kicker checkout |
Xiao |
Stored Beam & Injection |
0800-1200 |
Final lattice checkout |
Xiao |
Stored Beam & Injection |
1200-1600 |
Final orbit checkout |
Yipeng |
Stored Beam & Injection |
1600-2400 |
Final set-up of bunch purity monitor and pinhole camera |
Yang/Yipeng |
Stored Beam & Injection |
|
Monday, Sept 13, 2021 |
|
|
0000-6300 |
Top-up validation |
Ops |
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
|