Draft Schedule for Run02-12, 2021

September 20th 0800 – September 21st 0800



Time

Descriptions

Studiers

SR Status


Monday, September 20, 2021



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1130

Check out PAR RF-1

Berenc

Limited Injection

0930-1130

Troubleshoot RF-4 and relocate oscilloscope probes

RF Group

No Beam

0930-1130

Troubleshoot S35A:P0

Blake

No Beam

0930-1130

Troubleshoot S20B:P4

Bui

No Beam

1230-1430

Verify PAR RF medm changes

T. Smith

Limited Injection

1230-1430

Investigate PAR tune measurement

Yao

Limited Injection

1430-1630

LB+ intensity dependence studies

Sereno, Brill

Stored Beam & Injection

1630-2030

Orbit to rf phase feedback studies using the 7 GeV low alpha lattice

Sereno, Kallakuri, Carwardine, Brill

Stored Beam & Injection

2030-2330

Take BTS response data.

Yao, Shang

No beam

2330-2400

RG1 checkout

Yin-e Sun

Limited Injection


Tuesday, September 21, 2021



0000-0330

RG1 checkout

Yin-e Sun

Limited Injection

0330-0500

Orbit noise due to steering software check

Emery

Stored Beam & Injection

0500-0700

SR training

Ronzhin/Kimbro

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection