Machine Studies
Draft Schedule for Run02-12, 2021
September 20th 0800 – September 21st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, September 20, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1130 |
Check out PAR RF-1 |
Berenc |
Limited Injection |
0930-1130 |
Troubleshoot RF-4 and relocate oscilloscope probes |
RF Group |
No Beam |
0930-1130 |
Troubleshoot S35A:P0 |
Blake |
No Beam |
0930-1130 |
Troubleshoot S20B:P4 |
Bui |
No Beam |
1230-1430 |
Verify PAR RF medm changes |
T. Smith |
Limited Injection |
1230-1430 |
Investigate PAR tune measurement |
Yao |
Limited Injection |
1430-1630 |
LB+ intensity dependence studies |
Sereno, Brill |
Stored Beam & Injection |
1630-2030 |
Orbit to rf phase feedback studies using the 7 GeV low alpha lattice |
Sereno, Kallakuri, Carwardine, Brill |
Stored Beam & Injection |
2030-2330 |
Take BTS response data. |
Yao, Shang |
No beam |
2330-2400 |
RG1 checkout |
Yin-e Sun |
Limited Injection |
|
Tuesday, September 21, 2021 |
|
|
0000-0330 |
RG1 checkout |
Yin-e Sun |
Limited Injection |
0330-0500 |
Orbit noise due to steering software check |
Emery |
Stored Beam & Injection |
0500-0700 |
SR training |
Ronzhin/Kimbro |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |