Machine Studies
Draft Schedule for Run02-13, 2021
September 30th 0800 – October 4th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Thursday, September 30, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
0930-1130 |
RF-5 APS-U studies |
Berenc |
No Injection |
0930-1130 |
27ID scans |
Weir |
No Beam |
0930-1130 |
Correct the 10W Amp status bits in the Linac |
Pietryla |
No Injection |
0930-1130 |
Troubleshoot S36B:P5 |
Bui |
No Beam |
0930-1130 |
Replace S35 stripline rf amplifer |
Blake |
No Beam |
0930-1330 |
Troubleshoot PAR Fundamental AGC loop |
Berenc/Douell |
Limited Injection |
1000-1100 |
Lead clean up walk-through |
Hayden, et al |
Access Zone F |
1100-1230 |
Recover SR and Injectors |
OPS |
Stored Beam & Injection |
1230-1430 |
SR training |
Ronzhin/Kimbro |
Stored Beam & Injection |
1430-1830 |
BPM testing for putting back into datapool |
Sereno |
Stored Beam & Injection |
1830-2230 |
Spark/LB+ testing with splitters |
Sereno Brill Cheng |
Stored Beam & Injection |
2230-2400 |
6 GeV small alpha lattice |
Emery Sereno |
Stored Beam & Injection |
|
Friday, October 1, 2021 |
|
|
0000-0230 |
6 GeV small alpha lattice |
Emery Sereno |
Stored Beam & Injection |
0230-0600 |
Open |
|
Stored Beam & Injection |
0600-1200 |
Power shutdown in sectors 19-22 for long beam line building utilities |
AES and FAC |
No beam |
0900-1200 |
Ion effect in PAR |
Calvey |
No beam |
1200-1600 |
Booster chrom correction study. Ramp rf frequency |
Yao, Shang |
No Beam |
1230-1300 |
Check for PW leaks |
MOM |
Access Zone C |
1330-1400 |
Recover SR systems |
Ops |
No Beam |
1600-1800 |
Interleaving testing |
Dooling |
No Beam |
2000-2400 |
Open |
|
Stored Beam & Injection |
|
Saturday, October 2, 2021 |
|
|
0000-0200 |
Linac training |
LaBuda/Hotham |
Stored Beam & Injection |
0200-0800 |
6 GeV instabilities |
Emery |
Stored Beam & Injection |
0800-1400 |
S27 feedback controller experiment |
Sereno, Brill, Kallakuri, Carwardine |
Stored Beam & Injection |
1400-1800 |
BTS response measurement. |
Yao |
No beam |
1800-2400 |
RG1 beam tune up |
Yin-e Sun, Fystro, Shang |
No injection |
|
Sunday, October 3, 2021 |
|
|
0000-0200 |
Linac training |
LaBuda/Hotham |
Stored Beam & Injection |
0200-0800 |
6 GeV Instabilities |
Emery |
Stored Beam & Injection |
0800-1800 |
Open |
|
Stored Beam & Injection |
1800-2400 |
RG1 beam tune up |
Yin-e Sun, Fystro, Shang |
No injection |
|
Monday, October 4, 2021 |
|
|
0000-0200 |
Linac training |
LaBuda/Hotham |
Stored Beam & Injection |
0200-0700 |
Open |
|
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |