Machine Studies
Draft Schedule for Run02-3, 2021
June 14th 0800 – June 15
th
0800
Time Descriptions Studiers SR Status
June 14, 2021
0800-0810 Collect XBPM orbit data OPS Stored Beam
& Injection
0810-0930 Gap Scans and update IDGapFF look-up
tables
Hahne Stored Beam
& Injection
0930-1030 Troubleshoot bad SR BPMs Bui No Beam
0930-1030 Preventive maintenance of IOCS25FB Shoaf No Beam
0930-1030 Check out PAR septum Puttkammer Limited
Injection
0930-1130 PAR fundamental measurements Yawei Wang Limited
Injection
1130-1200 Recover SR OPS Stored Beam
& Injection
1200-1500 Booster TBT BPM measurements with
different charge
Yao Limited
Injection
1500-1600 S27B:P5 BPM offset Emery Stored Beam
& Injection
1600-2100 6 GeV instabilities Emery Stored Beam
& Injection
2100-2300 SR training (15-23) LaBuda/Kimbro Stored Beam
& Injection
2300-2400 Sextupole optimization Huang/Shang/
Emery
Stored Beam
& Injection
Tuesday, June 14, 2021
0000-0300 Sextupole optimization Huang/Shang/
Emery
Stored Beam
& Injection
0300-0700 Low alpha lattice sudy Sajaev/Huang Stored Beam
& Injection
0700-0800 Prepare for User beam OPS Stored Beam
& Injection