Machine Studies
Draft Schedule for Run02-5, 2021
June 28th 0800 - June 29th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 28, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1030 |
Remove diagnostics from RF-4 |
Trento |
No Beam |
0930-1030 |
RF waveguide switch to RF3/RF4
|
Yoder |
No Beam |
0930-1130 |
Investigate Booster Ramping Correctors |
Puttkammer |
Limited Injection |
0930-1130 |
Troubleshoot S15 communication error |
Jordan |
No Beam |
0930-1130 |
Investigate iocs21fb |
Xu |
No Beam |
0930-1130 |
PAR power supply Sextupole P:S1 |
Vanis |
Limited Injection |
0930-1130 |
Test S:BM IP addresses for remote meters |
Jordan |
No Beam |
0930-1130 |
Change filters in water system P-SRVC-36 |
Moonier |
No Beam S35/36 PS down |
1000-1130 |
Check limimt switches at 2ID & 3ID |
Weir |
Access Zone A |
1130-1200 |
Recovery SR |
OPS |
Stored Beam & Injection |
1200-1700 |
Orbit Switch |
Yipeng Sun |
Stored Beam & Injection |
1700-1800 |
Removing AP[HV]1 BPM from BTS orbit feedback |
Emery |
Stored Beam & Injection |
1800-1900 |
Test dimtel with 324 fill |
Emery |
Stored Beam & Injection |
1900-2200 |
6 GeV stability |
Emery |
Stored Beam & Injection |
2200-2400 |
Booster chrom correction test |
Yao/Shang |
Booster Beam Only |
|
Tuesday, June 29, 2021 |
|
|
0000-0100 |
Booster chrom correction test |
Yao/Shang |
Booster Beam Only |
0100-0500 |
Low alpha lattice |
Sajaev |
Stored Beam & Injection |
0500-0700 |
SR training (23-07) |
Grodecki/Kimbro |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |