Machine Studies

Draft Schedule for Run03-01, 2021

October 11th 0800 – October 12st 0800



Time

Descriptions

Studiers

SR Status


Monday, October 11, 2021



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1130

Check out PAR RF-1

Berenc

No beam

0930-1030

Remove the Dranetz AC signal analyzer from RF4. LOTO RF4

RF Group

No beam

0930-1130

PAR RF Source switching box investigations. Linac off.

Berenc

No beam

0930-1130

Booster signal levels investigations. No booster beam needed.

Berenc

No beam

0930-1230

Look at PS in SR sector 7

Vargas

No beam

0930-1230

BIK fiber signal strength (Booster)

Vanis

No beam

0930-1030

Rack out Zone D, then Zone B

FAC

No beam

1030-1230

S27A bpm inspection

Diag group

Zone D Access

1030-1230

S25 ID checkout

Diag group

Zone D Access

1130-1230

Recover PAR and injector beam after RF work

Ops

Zone D Access

1230-1330

Fix limit switch ID16

Weir

Zone B access

1230-1530

B:IK tripping check. Booster beam available.

Yao

Zone B access

1330-1430

Rack in Zone B. Rack-in of Zone D can start just before

FAC

Zone B Access

1430-1500

Setup SR

OPS

No beam

1500-1800

6 GeV small alpha tuning plus some RTFB measurements

Emery Sajaev Sereno Kallakuri Carwardine

SR beam and Injection

1800-2400

6 GeV Instabilities

Emery

SR beam and Injection


Tuesday, September 21, 2021



0000-0700

Open


SR beam and Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection