Machine Studies
Draft Schedule for Run03-01, 2021
October 11th 0800 – October 12st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 11, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1130 |
Check out PAR RF-1 |
Berenc |
No beam |
0930-1030 |
Remove the Dranetz AC signal analyzer from RF4. LOTO RF4 |
RF Group |
No beam |
0930-1130 |
PAR RF Source switching box investigations. Linac off. |
Berenc |
No beam |
0930-1130 |
Booster signal levels investigations. No booster beam needed. |
Berenc |
No beam |
0930-1230 |
Look at PS in SR sector 7 |
Vargas |
No beam |
0930-1230 |
BIK fiber signal strength (Booster) |
Vanis |
No beam |
0930-1030 |
Rack out Zone D, then Zone B |
FAC |
No beam |
1030-1230 |
S27A bpm inspection |
Diag group |
Zone D Access |
1030-1230 |
S25 ID checkout |
Diag group |
Zone D Access |
1130-1230 |
Recover PAR and injector beam after RF work |
Ops |
Zone D Access |
1230-1330 |
Fix limit switch ID16 |
Weir |
Zone B access |
1230-1530 |
B:IK tripping check. Booster beam available. |
Yao |
Zone B access |
1330-1430 |
Rack in Zone B. Rack-in of Zone D can start just before |
FAC |
Zone B Access |
1430-1500 |
Setup SR |
OPS |
No beam |
1500-1800 |
6 GeV small alpha tuning plus some RTFB measurements |
Emery Sajaev Sereno Kallakuri Carwardine |
SR beam and Injection |
1800-2400 |
6 GeV Instabilities |
Emery |
SR beam and Injection |
|
Tuesday, September 21, 2021 |
|
|
0000-0700 |
Open |
|
SR beam and Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |