Machine Studies
Draft Schedule for Run03-3, 2021
October 25th 0800 – October 26th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 25, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Limited Injection |
0810-0930 |
PAR requalifications (portion) |
Fystro/Weyer/ Orne |
Limited Injection |
0930-1030 |
Check and fix S35 P0Feedback pre-amplifier |
Zabel, Blake |
No Beam |
0930-1130 |
Measure PAR RF source switching box |
Berenc |
No Beam |
0930-1130 |
Waveguide switch and RF-4 measurements I (spot-knocking, no beam) |
RF Group |
No beam |
1130-1530 |
Waveguide switch and RF-4 measurements II |
RF Group |
Stored Beam & Injection |
1130-1330 |
Test the PAR BDM acquisition script. PAR beam is needed |
Harkay, Shang |
Limited Injection |
1330-1530 |
Put S27A bpms back into orbit correction. Parasitic to RF group’s time |
Emery or Sereno |
Stored Beam & Injection |
1530-1930 |
Booster chromaticity. Large RF frequency changes |
Yao, Shang |
No beam |
1930-2400 |
6 GeV beam dynamics |
Emery |
Stored Beam & Injection |
|
Tuesday, October 26, 2021 |
|
|
0000-0500 |
Open |
|
Stored Beam & Injection |
0500-0700 |
SR training |
Ronzhin/Kimbro |
Stored Beam & Injection |
|
|
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |