Draft Schedule for Run03-4, 2021

November 1st 0800 – November 2nd 0800



Time

Descriptions

Studiers

SR Status


Monday, November 1, 2021



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

Reboot ioclet1bpm

Arnold

No Beam

1000-1200

Troubleshoot pump 515 (PS sectors 17/18)

Wright

No Beam

1000-1600

Tie in 25ID FEEPS/PSS

McNamara

Authorized Access Zone D

1030-1130

RF waveguide switch

RF Group

No Beam

1030-1230

Check 28ID XBPM Motion Table

Yang

Authorized Access Zone D

0930-1030

SR training

Ronzhin/Kimbro

No Beam

1030-1230

PAR requalifications

Fystro/Ronzhin/ Kimbro

Limited Injection

1230-1330

Setup scope for SR kicker waveforms

Fystro Shang

No Beam

1330-1400

Put S19A:V3 back into RTFB, and possibly other bpms

Emery

No beam

1600-1700

Recover SR from access. Check orbit rms.

Ops

Stored Beam & Injection

1700-2200

Orbit Switch to 324 bunches

Yipeng Sun

Stored Beam & Injection

2200-2400

S28ID GRID-XBPM calibration

Yang

Stored Beam & Injection


Tuesday, November 2, 2021



0000-0200

S28ID GRID-XBPM calibration

Yang

Stored Beam & Injection

0200-0700

35ID steering calibration

Li

Stored Beam & Injection Shutters enabled/Supplemental time

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection