Machine Studies
Draft Schedule for Run03-4, 2021
November 1st 0800 – November 2nd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 1, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1000 |
Reboot ioclet1bpm |
Arnold |
No Beam |
1000-1200 |
Troubleshoot pump 515 (PS sectors 17/18) |
Wright |
No Beam |
1000-1600 |
Tie in 25ID FEEPS/PSS |
McNamara |
Authorized Access Zone D |
1030-1130 |
RF waveguide switch |
RF Group |
No Beam |
1030-1230 |
Check 28ID XBPM Motion Table |
Yang |
Authorized Access Zone D |
0930-1030 |
SR training |
Ronzhin/Kimbro |
No Beam |
1030-1230 |
PAR requalifications |
Fystro/Ronzhin/ Kimbro |
Limited Injection |
1230-1330 |
Setup scope for SR kicker waveforms |
Fystro Shang |
No Beam |
1330-1400 |
Put S19A:V3 back into RTFB, and possibly other bpms |
Emery |
No beam |
1600-1700 |
Recover SR from access. Check orbit rms. |
Ops |
Stored Beam & Injection |
1700-2200 |
Orbit Switch to 324 bunches |
Yipeng Sun |
Stored Beam & Injection |
2200-2400 |
S28ID GRID-XBPM calibration |
Yang |
Stored Beam & Injection |
|
Tuesday, November 2, 2021 |
|
|
0000-0200 |
S28ID GRID-XBPM calibration |
Yang |
Stored Beam & Injection |
0200-0700 |
35ID steering calibration |
Li |
Stored Beam & Injection Shutters enabled/Supplemental time |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |