Draft Schedule for Run03-5, 2021

November 8th 0800 – November 9th 0800



Time

Descriptions

Studiers

SR Status


Monday, November 8, 2021



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

PSS end to end test

Boron

No Beam

0930-1000

Bring ring down/SR training

Ronzhin/Kimbro

No Beam

1000-1200

Reset limit switch at 25ID

Weir

Access Zone D

1000-1400

Troubleshoot pump 515 S17,18

Wright

No Beam

1030-1100

Map BTS/SR penetration

Weinands

Access Zone F

1030-1130

Replace S36 cav 1 blower

MOM

Access Zone F

1030-1230

PAR re-qualifications

Fystro/Smith/Berg

Limited Injection

1400-1500

Recover SR/SR training

Ronzhin/Kimbro

No Beam

1500-1600

Test steering recovery through SCR ramping

Shang Emery

Stored Beam & Injection

1600-1700

Investigate how ID16 ended up with bumps after orbit switch

Yipeng Emery

Stored Beam & Injection

1700-1800

Check IR temperature response to 48-bunch pattern (7 GeV)

Emery

Stored Beam & Injection

1800-2400

6 GeV Beam Dynamics

Emery

Stored Beam & Injection


Tuesday, November 9, 2021



0000-0100

Check injection for 7 GeV

Emery

Stored Beam & Injection

0100-0500

Open


Stored Beam & Injection

0500-0700

Linac training (23-07)

LaBuda/Hotham

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection