Draft Schedule for Run03-6, 2021

November 15th 0800 – November 17th 0800



Time

Descriptions

Studiers

SR Status


Monday, November 15, 2021



0800-0810

Refill to 100 mA + Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1010

Linac training (2 hrs)

LaBuda/Hotham

Limited Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1330

Storage Ring 60Hz line-harmonic RF Noise Suppression (beam perhaps second half)

Berenc

No Beam/RF on

1130-1330

Possible SR stored beam for 60Hz line-harmonic RF Noise Suppression

Ops

Stored Beam

1300-1500

PAR/Booster re-qualifications

Fystro

Limited Injection

1400-1430

Restore pump 515 S17,18

Wright

No Beam PS at 0

1400-1600

Replace RF cavity blower

Pace

Access Zone F

1400-1600

Investigate BTS:FS3

Wright

Access Zone F

1400-1600

Adjust leak rate for gas injection studies

Hoyt

Access Zone E

1500-1600

Waveguide measurements at K2

Meyer

No Injection

1600-1800

Setup 6 GeV stored beam in RHB-S7 lattice

Emery, Kallakuri

6 GeV Stored Beam

1800-2400

Gas injection studies at 900 and 100 nTorr

Calvey, Emery, Kallakuri, Hoyt

6 GeV Stored Beam


Tuesday, November 16, 2021



0000-0200

Single bunch limit checkout for hybrid mode (7 GeV, as usual)

Emery

Stored Beam & Injection

0200-0600

Open


Stored Beam & Injection

0600-0700

Interleaving test with top-up running (any bunch pattern)

Dooling, Fystro

Stored Beam & Injection

0700-0900

Linac training

LaBuda/Hotham

Stored Beam & Injection

0900-1000

Setup low-alpha lattice 6 GeV

Emery, Kallakuri

6 GeV Stored Beam

1000-1400

Low-alpha lattice 6 GeV with noise suppression

Sereno, Kallakuri, Berenc, Emery

6 GeV Stored Beam

1400-1500

Setup 7 GeV Hybrid mode lattice

Emery

Stored Beam & Injection

1500-2000

Hybrid mode orbit setup

Yipeng Sun

Stored Beam & Injection

2000-2200

Test steering recovery through SCR files

Shang

Stored Beam & Injection

2200-2400

RG1 study

Yin-e Sun, Fystro

Stored Beam & Injection


Wednesday, November 16, 2021



0000-0200

RG1 study

Yin-e Sun, Fystro

Stored Beam & Injection

0200-0630

Open


Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection