Machine Studies
Draft Schedule for Run03-6, 2021
November 15th 0800 – November 17th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 15, 2021 |
|
|
0800-0810 |
Refill to 100 mA + Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1010 |
Linac training (2 hrs) |
LaBuda/Hotham |
Limited Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1330 |
Storage Ring 60Hz line-harmonic RF Noise Suppression (beam perhaps second half) |
Berenc |
No Beam/RF on |
1130-1330 |
Possible SR stored beam for 60Hz line-harmonic RF Noise Suppression |
Ops |
Stored Beam |
1300-1500 |
PAR/Booster re-qualifications |
Fystro |
Limited Injection |
1400-1430 |
Restore pump 515 S17,18 |
Wright |
No Beam PS at 0 |
1400-1600 |
Replace RF cavity blower |
Pace |
Access Zone F |
1400-1600 |
Investigate BTS:FS3 |
Wright |
Access Zone F |
1400-1600 |
Adjust leak rate for gas injection studies |
Hoyt |
Access Zone E |
1500-1600 |
Waveguide measurements at K2 |
Meyer |
No Injection |
1600-1800 |
Setup 6 GeV stored beam in RHB-S7 lattice |
Emery, Kallakuri |
6 GeV Stored Beam |
1800-2400 |
Gas injection studies at 900 and 100 nTorr |
Calvey, Emery, Kallakuri, Hoyt |
6 GeV Stored Beam |
|
Tuesday, November 16, 2021 |
|
|
0000-0200 |
Single bunch limit checkout for hybrid mode (7 GeV, as usual) |
Emery |
Stored Beam & Injection |
0200-0600 |
Open |
|
Stored Beam & Injection |
0600-0700 |
Interleaving test with top-up running (any bunch pattern) |
Dooling, Fystro |
Stored Beam & Injection |
0700-0900 |
Linac training |
LaBuda/Hotham |
Stored Beam & Injection |
0900-1000 |
Setup low-alpha lattice 6 GeV |
Emery, Kallakuri |
6 GeV Stored Beam |
1000-1400 |
Low-alpha lattice 6 GeV with noise suppression |
Sereno, Kallakuri, Berenc, Emery |
6 GeV Stored Beam |
1400-1500 |
Setup 7 GeV Hybrid mode lattice |
Emery |
Stored Beam & Injection |
1500-2000 |
Hybrid mode orbit setup |
Yipeng Sun |
Stored Beam & Injection |
2000-2200 |
Test steering recovery through SCR files |
Shang |
Stored Beam & Injection |
2200-2400 |
RG1 study |
Yin-e Sun, Fystro |
Stored Beam & Injection |
|
Wednesday, November 16, 2021 |
|
|
0000-0200 |
RG1 study |
Yin-e Sun, Fystro |
Stored Beam & Injection |
0200-0630 |
Open |
|
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |