Machine Studies
Draft Schedule for Run03-6, 2021
November 25th 0000 – November 26th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Thursday, November 25, 2021 |
|
|
0000-0400 |
PC study with K2 down |
Dooling |
Stored Beam & No Injection |
0400-0700 |
Linac magnet power supply resistance measurements |
Fystro |
Stored Beam & Injection |
0600-0700 |
Swap S30B:H2 |
PS group |
No beam |
0700-0800 |
Swap S16A:Q2 |
PS group |
No beam |
0700-0900 |
Linac training |
LaBuda/Hotham |
Stored Beam & Limited Injection |
0900-1000 |
Study K3 reflected power |
Yin-e Sun |
Stored Beam & Limited Injection |
1000-1300 |
Steering recovery from SCR file |
Shang |
Stored Beam & Injection |
1300-1700 |
BPM offset measurement or open |
OPS |
Stored Beam & Injection |
1700-2300 |
Linac optimizer studies |
Nikita |
Stored Beam & Injection |
2300-2400 |
2/3/4nC continuous to BTS dump for read-only data collection |
Nikita |
Stored Beam & Injection |
|
Friday, November 26, 2021 |
|
|
0000-0200 |
2/3/4nC continuous to BTS dump for read-only data collection |
Nikita |
Stored Beam & Injection |
0200-0400 |
Open |
|
Stored Beam & Injection |
0400-0630 |
Check injection into hybrid mode |
Emery |
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |