Draft Schedule for Run03-6, 2021

November 25th 0000 – November 26th 0800



Time

Descriptions

Studiers

SR Status


Thursday, November 25, 2021



0000-0400

PC study with K2 down

Dooling

Stored Beam & No Injection

0400-0700

Linac magnet power supply resistance measurements

Fystro

Stored Beam & Injection

0600-0700

Swap S30B:H2

PS group

No beam

0700-0800

Swap S16A:Q2

PS group

No beam

0700-0900

Linac training

LaBuda/Hotham

Stored Beam & Limited Injection

0900-1000

Study K3 reflected power

Yin-e Sun

Stored Beam & Limited Injection

1000-1300

Steering recovery from SCR file

Shang

Stored Beam & Injection

1300-1700

BPM offset measurement or open

OPS

Stored Beam & Injection

1700-2300

Linac optimizer studies

Nikita

Stored Beam & Injection

2300-2400

2/3/4nC continuous to BTS dump for read-only data collection

Nikita

Stored Beam & Injection


Friday, November 26, 2021



0000-0200

2/3/4nC continuous to BTS dump for read-only data collection

Nikita

Stored Beam & Injection

0200-0400

Open


Stored Beam & Injection

0400-0630

Check injection into hybrid mode

Emery

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection