Machine Studies

Draft Schedule for Run03-8, 2021

December 6th 0800 – December 8th 0800



Time

Descriptions

Studiers

SR Status


Monday, December 6, 2021



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-0945

Reboot siocradmon

Pietryla

No Beam

0930-1030

Swap voodoo card at RF-4

RF Group

No Beam

0930-1030

Switch pw pump 515

Wright

S16-19 PS down

1030-1130

SR pump vibration measurements

Preissner

Zone F PS down

0930-1330

Troubleshoot RF-5 tuner problems

RF Group

No Beam

1000-1100

PS17 reconfiguration assessment

Harkay, et al

No beam
Access PAR

1300-1500

SR recovery and SR training (beam available at 1330)

Ronzhin/Kimbro

Stored Beam & Injection

1100-1330

PAR requalifications (booster unavailable)

Fystro

Limited Injection

1330-1500

Booster requalifications (needs coordination with SR training)

Fystro

Limited Injection

1500-1900

Find signal on RTFB ch. 40. 7 GeV. Fill one time for 324 bunches. Possible 6 GeV magnets at 1730, and inject again at 1800

Brill Kallakuri

Stored Beam & No Injection

1500-1800

PAR injection efficiency optimizer

Harkay, Yine Sun, Fystro, Calvey, Shang, Kuklev, Lobach

Stored Beam & No Injection

1800-2000

Linac training (15-23)

LaBuda/Hotham

Limited Injection

2000-2300

Center beam at AQ1 horizontally. BTS beam

Yao, Shang

Stored Beam & No Injection

2300-2400

RG1 studies

Yine Sun

Stored Beam & No Injection


Tuesday, December 7, 2021



0000-0400

RG1 studies

Yine Sun

Stored Beam & No Injection

0400-0500

Open


Stored Beam & Injection

0500-0900

BTS optics (need on-call technicians)

Borland

Stored Beam & No Injection

0900-1100

SR training (07-15)

Ronzhin/Kimbro

Stored Beam & Injection

1100-1300

Fill 324 bunches and test steering software

Shang Emery

Stored Beam & No Injection

1100-1700

PAR RF12 SS amplifier with 5 nC beam

Harkay, Calvey, Wienands, T. Smith, Berenc

Stored Beam & No Injection

1700-1900

Linac training (15-23)

LaBuda/Hotham

Stored Beam & Injection

1900-2400

Orbit switch to 24 bunches

Yipeng Sun

Stored Beam & Injection

1900-2100

test new Booster beam current waveform if the software is ready

Yao, Dimonte

Stored Beam & Injection


Wednesday, December 8, 2021



0000-0400

6 GeV Beam Dynamics

Emery

Stored Beam & Injection

0400-0630

Check injection and UBOP

Emery

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection