Machine Studies
Draft Schedule for Run03-8, 2021
December 6th 0800 – December 8th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, December 6, 2021 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-0945 |
Reboot siocradmon |
Pietryla |
No Beam |
0930-1030 |
Swap voodoo card at RF-4 |
RF Group |
No Beam |
0930-1030 |
Switch pw pump 515 |
Wright |
S16-19 PS down |
1030-1130 |
SR pump vibration measurements |
Preissner |
Zone F PS down |
0930-1330 |
Troubleshoot RF-5 tuner problems |
RF Group |
No Beam |
1000-1100 |
PS17 reconfiguration assessment |
Harkay, et al |
No beam |
1300-1500 |
SR recovery and SR training (beam available at 1330) |
Ronzhin/Kimbro |
Stored Beam & Injection |
1100-1330 |
PAR requalifications (booster unavailable) |
Fystro |
Limited Injection |
1330-1500 |
Booster requalifications (needs coordination with SR training) |
Fystro |
Limited Injection |
1500-1900 |
Find signal on RTFB ch. 40. 7 GeV. Fill one time for 324 bunches. Possible 6 GeV magnets at 1730, and inject again at 1800 |
Brill Kallakuri |
Stored Beam & No Injection |
1500-1800 |
PAR injection efficiency optimizer |
Harkay, Yine Sun, Fystro, Calvey, Shang, Kuklev, Lobach |
Stored Beam & No Injection |
1800-2000 |
Linac training (15-23) |
LaBuda/Hotham |
Limited Injection |
2000-2300 |
Center beam at AQ1 horizontally. BTS beam |
Yao, Shang |
Stored Beam & No Injection |
2300-2400 |
RG1 studies |
Yine Sun |
Stored Beam & No Injection |
|
Tuesday, December 7, 2021 |
|
|
0000-0400 |
RG1 studies |
Yine Sun |
Stored Beam & No Injection |
0400-0500 |
Open |
|
Stored Beam & Injection |
0500-0900 |
BTS optics (need on-call technicians) |
Borland |
Stored Beam & No Injection |
0900-1100 |
SR training (07-15) |
Ronzhin/Kimbro |
Stored Beam & Injection |
1100-1300 |
Fill 324 bunches and test steering software |
Shang Emery |
Stored Beam & No Injection |
1100-1700 |
PAR RF12 SS amplifier with 5 nC beam |
Harkay, Calvey, Wienands, T. Smith, Berenc |
Stored Beam & No Injection |
1700-1900 |
Linac training (15-23) |
LaBuda/Hotham |
Stored Beam & Injection |
1900-2400 |
Orbit switch to 24 bunches |
Yipeng Sun |
Stored Beam & Injection |
1900-2100 |
test new Booster beam current waveform if the software is ready |
Yao, Dimonte |
Stored Beam & Injection |
|
Wednesday, December 8, 2021 |
|
|
0000-0400 |
6 GeV Beam Dynamics |
Emery |
Stored Beam & Injection |
0400-0630 |
Check injection and UBOP |
Emery |
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |