Draft Schedule for Run03-9, 2021

December 13th 0800 – December 14th 0800



Time

Descriptions

Studiers

SR Status


Monday, December 13, 2021



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1030

Replace MPV956B board in iocs40fb

Xu

No Beam

0930-1130

Electrical measurements of S:IS

Puttkammer

No Beam

1000-1100

Measure cable run

Blake

Access Booster (no linac beam)

1100-1300

Measure BTS quadrupole offsets

Borland

No beam

1100-1200

Collect SR kicker current waveform data

Emery

No beam

1200-1300

SR training with no beam

Ronzhin/Kimbro

No beam

1300-1500

SR beam recovery and training

Ronzhin/Kimbro

Stored Beam & Injection

1500-1700

Booster requalifications (15-18)

Fystro

Stored Beam & Limited Injection

1500

Fill ring with 324 bunches

Ops

Stored Beam & Injection

1500-1800

RTFB DAQ card data

Kallakuri et al

Stored Beam & Limited Injection

1700-2200

Booster cavity calibration

Calvey, Berenc

No Injection

2200-2400

AQ1 offset measurement and centering

Yao, Shang

No Injection

2200-2400

PC Gun beam with L2 down

Dooling

No Injection


Tuesday, December 14, 2021



0000-0400

RG1 PAR injection efficiency

Yine Sun et al

No injection

0400-0600

PAR training

LaBuda/Hotham

Limited Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection