Draft Schedule for Run01-1, 2022

Jan 25th 0800 – Feb 1st 0800



Time

Descriptions

Studiers

SR Status


Monday, Jan 24, 2022 - Prestudies



0800-1000

MPS Validations

Smith/Flood

No Injection

1000-2400

RF Conditioning with Beam (24 singlets)

Flood/OPS

Stored Beam & Injection

~1500

Pinhole camera initial set-up (above 50 mA) parallel to RF conditioning

Yang

Stored Beam & Injection

~1600

BCM Gen 3 checkout

Emery

Stored Beam & Injection

~1700

BPM checkout (parallel to RF conditioning)

Sereno

Stored Beam & Injection


Tuesday, Jan 25, 2022



0800-1200

BPLD validations

Hahne

Stored Beam & Injection

1200-1400

X-BPM sanity check

Hahne

Stored Beam & Injection

1400-1500

Setup Dimtel timing

Emery

Stored Beam & Injection

1500-1900

Lattice set up

Emery

Stored Beam & Injection

1900-2400

Orbit recovery

Yipeng

Stored Beam & Injection


Wednesday, Jan 26, 2022



0000-0600

Kicker waveforms, Accumulation limits checks

Emery

Stored Beam & Injection

0600-0800

Open


Stored Beam & Injection

0800-1800

IETS

Wienands, Fors, Berenc, Farrell

Stored Beam & Injection

1800-2200

BTS quads offset measurement for AQ2 and AQ3

Yao, Shang

No injection

2200-2400

Open




Thursday, Jan 27, 2021



0000-0800

6 GeV lattice checkout (for gas injection)

Emery

Stored Beam & Injection

0800-1200

Test Booster chromaticity correction. Rf frequency change

Yao, Shang

No beam

1200-1500

PAR fast loss monitor measurements

Harkay, Dooling

No Beam

1500-1700

Access to adjust leak valves

Hoyt

No beam

1700-1800

6 GeV setup

Emery

Stored Beam & Injection

1800-2400

Gas injection studies at 900 and 100 nTorr

Calvey, Hoyt, Emery, Kallakuri

Stored Beam & Injection


Friday, Jan 28, 2022



0000-0800

Linac magnet measurements/optimizer debug (continuous injection to LTP)

Kuklev

Stored Beam & No Injection

0800-1000

PAR current waveform scope signals

Yao

Stored Beam & Injection

1000-1400

Booster tune up

Calvey

No injection

1400-2000

IEX/CPU checkout

Emery

Stored Beam & Injection

2000-2400

6 GeV low-alpha lattice setup (?)(pending card test in lab)

Emery

Stored Beam & Injection


Saturday, Jan 29, 2022



0000-0900

Open



0900-1500

25-ID XBPM

Yang

Stored Beam & Injection

1500-2400

IEX/CPU correction if necessary

Emery

Stored Beam & Injection






Sunday, Jan 30, 2022



0000-0900

Linac optimization

Kuklev

No Injection

0900-1500

28-ID XBPM study

Yang

Stored Beam & Injection

1000-1800

BTS 5x5 sigma matrix measurements

Borland

Stored Beam & Injection

1800-2400

AI/ML PAR Anomaly Classification

Lobach

Stored Beam & Injection


Monday, Jan 31, 2022



0000-0600

6 GeV Stability

Emery

Stored Beam & Injection

0600-0700

Open



0700-1000

Open



1000-1200

Abort kicker checkout

Yipeng/Harkay

Stored Beam & Injection

1200-1600

Final lattice checkout

Emery

Stored Beam & Injection

1600-2400

Final set-up of bunch purity monitor and pinhole camera

Yang/Yipeng

Stored Beam & Injection


Tuesday, Feb 1, 2022



0000-6300

Open


Stored Beam & Injection

0630-0800

Prepare for User beam

OPS