Machine Studies

Schedule for Run01-11, 2022

April 11th 0800 – April 12th 0800



Time

Descriptions

Studiers

SR Status


Monday, April 11, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1230

APS-U BPLD card testing

Shang, Bui, Smith, Emery

Stored Beam & Injection

1230-1530

PAR bunch cleaning study with chirp drive.

Yao

Stored Beam & Injection/No Beam

1400-1500

Set up for Zone E access

OPS

No Beam

1500-1600

WiFi mapping

Stevens

Access Zone E

1500-1600

Replace relay card at RF-5

RF Group

No Injection

1500-1600

RF waveguide switch

RF Group

No Beam

1500-1700

Gas injection set up

Hoyt/Calvey

Access Zone E

1700-1800

Setup SR 6 GeV

Emery Kallakuri

Stored Beam & Injection

1800-2300

Booster training as time/studies permits

Ops

Stored Beam & Injection

1800-2400

Ion studies

Calvey, Kallakuri, Emery

Stored Beam & Injection


Tuesday, April 12, 2022



0000-0300

Test LEA Interleaving-Light while SR in top-up injection operations

Wootton et al

Stored Beam & Injection

0300-0600

Open


Stored Beam & Injection

0600-0700

Checkout IEX controls (after a Zone shut down)

Smith

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection