Machine Studies

Draft Schedule for Run01-3, 2022

February 14th 0800 – February 15th 0800



Time

Descriptions

Studiers

SR Status


Monday, February 15, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1130

Test B:SD spare regulator board

Puttkammer

Limited Injection

0930-1130

PAR training

Ronzhin/Hotham

Limited Injection

1000-1130

APS-U manifold mock up

Bechtold

Access Zone A

1130-1200

Insert attenuators on sector 35 Dimtel bpm input cables

Brill

Stored Beam & Injection

1130-1200

SR recovery. One bunch 3-4 mA

Ops

Stored Beam & Injection

1200-1300

Check Dimtel bpm/detector signal on scope

Brill

Stored Beam but No Injection

1200-1400

Set up Linac K2 down mode

Yin-e Fystro

Stored Beam but No Injection

1200-1400

test B:IK over-voltage fix, includes ioc reboot

Hong Fors Yao

Stored Beam but No Injection

1400-1800

Dimtel checkout with new attenuators for different bunch patterns

Emery

Stored Beam & Injection

1800-2100

Test and measure Booster dispersion measurement

Yao Shang

Stored Beam but No Injection

2100-2400

6 GeV studies

Emery

Stored Beam & Injection


Tuesday, February 15, 2022



0000-0600

linac optimization

Kuklev

Stored Beam but No Injection

0600-0700

Open


Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection