Machine Studies
Draft Schedule for Run01-3, 2022
February 14th 0800 – February 15th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 15, 2022 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1130 |
Test B:SD spare regulator board |
Puttkammer |
Limited Injection |
0930-1130 |
PAR training |
Ronzhin/Hotham |
Limited Injection |
1000-1130 |
APS-U manifold mock up |
Bechtold |
Access Zone A |
1130-1200 |
Insert attenuators on sector 35 Dimtel bpm input cables |
Brill |
Stored Beam & Injection |
1130-1200 |
SR recovery. One bunch 3-4 mA |
Ops |
Stored Beam & Injection |
1200-1300 |
Check Dimtel bpm/detector signal on scope |
Brill |
Stored Beam but No Injection |
1200-1400 |
Set up Linac K2 down mode |
Yin-e Fystro |
Stored Beam but No Injection |
1200-1400 |
test B:IK over-voltage fix, includes ioc reboot |
Hong Fors Yao |
Stored Beam but No Injection |
1400-1800 |
Dimtel checkout with new attenuators for different bunch patterns |
Emery |
Stored Beam & Injection |
1800-2100 |
Test and measure Booster dispersion measurement |
Yao Shang |
Stored Beam but No Injection |
2100-2400 |
6 GeV studies |
Emery |
Stored Beam & Injection |
|
Tuesday, February 15, 2022 |
|
|
0000-0600 |
linac optimization |
Kuklev |
Stored Beam but No Injection |
0600-0700 |
Open |
|
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |