Draft Schedule for Run01-4, 2022
February 21st 0800 – February 22nd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 21, 2022 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1130 |
Replace AC power relay at RF-1 |
RF Group |
No Beam |
0930-1130 |
Test DAC card setup with IOCS40FB |
Kallakuri, Brill, Sereno |
No Beam |
0930-1030 |
Measure kicker noise and signal levels on the BTS current monitor. No injector beam necessary |
Keane |
No Beam |
1000-1300 |
Troubleshoot 14ID safety shutter |
Klute |
Access Zone B ratchet door |
1200-1330 |
PAR training (07-15) |
Ronzhin/Hotham |
Limited Injection |
1330-1400 |
Re-establish SR beam. Fill 324 bunches. |
Ops |
Beam and Injection |
1400-1500 |
Interleaving RG2 thermionic gun between PAR and LEA operations |
Wootton |
Stored Beam & Injection |
1500-1600 |
Check out again LBL BCM in SR for 324 bunches |
Emery |
Stored Beam & Injection |
1500-1800 |
Booster Injection Optimizer test |
Yao Shang |
Stored Beam & Injection |
1800-2000 |
Open |
|
Stored Beam & Injection |
2000-2400 |
6 GeV studies |
Emery |
Stored Beam & Injection |
|
Tuesday, February 22, 2022 |
|
|
0000-0500 |
Linac data collection |
Kuklev |
Stored Beam & No Injection |
0500-0700 |
Open |
|
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |