Machine Studies
Draft Schedule for Run01-7, 2022
March 14th 0800 – March 16th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 14, 2022 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1130 |
Install metasys pvs |
Smith |
Stored Beam & Injection |
0930-1230 |
Swap broken S36 amp w/ S2 amp |
Zabel |
No Beam |
1000-1130 |
APS-U piping mock up |
MOM |
Access Zone A |
1130-1200 |
SR recovery. 324 bunches. |
Ops |
Stored Beam & Injection |
1200-1400 |
Apply proposed reduced ID35 steering. Hybrid mode setup. |
Emery Yipeng |
Stored Beam & Injection |
1400-1900 |
Hybrid mode Orbit setup |
Yipeng |
Stored Beam & Injection |
1900-2200 |
6 GeV low alpha check-out |
Emery Kallakuri Brill |
Stored Beam & Injection |
2200-2400 |
Open |
|
|
|
Tuesday, March 15, 2022 |
|
|
0000-0500 |
Open |
|
|
0500-0700 |
Injector training |
Hotham/Ronzhin |
Limited Injection |
0700-0900 |
Investigate RTFB interlock action from RF klystron status |
Xu |
Stored Beam & Injection |
0900-1300 |
swap cables for S2 and S35 Dimtel of FT/R9 in A014, and repeat disconnection tests |
Brill Emery |
Stored Beam & Injection |
1300-1700 |
linac RG1/RG2 optimizer debugging |
Kuklev Shang |
Stored beam & No Injection |
1300-1700 |
SR coupling optimization |
Yipeng |
Stored beam & No Injection |
1700-2100 |
6 GeV low alpha RTFB loops |
Kallakuri Brill Emery |
Stored Beam & Injection |
21000-2400 |
Further hybrid mode checkout. |
|
Stored Beam & Injection |
|
Wednesday, March 16, 2022 |
|
|
0000-0500 |
Open |
|
Stored Beam & Injection |
0500-0700 |
Injector training |
Hotham/Ronzhin |
Limited Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |