Machine Studies

Draft Schedule for Run01-8, 2022

March 21st 0800 – March 22nd 0800



Time

Descriptions

Studiers

SR Status


Monday, March 21, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

Fill 100 mA hybrid in SR

Ops/Emery

Stored Beam & Injection

1000-1100

Steering for extra BPLD margin (3ID) plus punch down C:H1 magnets

Emery

Stored Beam & No Injection

1030-1130

Investigate PAR dipole trip

Puttkammer/

Wright

Access PAR

1130-1330

Injector training

Hotham/Ronzhin

Stored Beam & Limited Injection

1330-1630

PAR tune measurement and bunch cleaning investigation

Yao, Shang

Stored Beam & Limited Injection

1330-1530

SR training, Dimtel setup with 1 mA

Emery Yipeng

Stored Beam & Limited Injection

1630-1830

Checkout of beam booster bypass dump

Wootton

Stored Beam & No Injection

1830-2330

RG1 studies

Yin-e, Fystro

Stored Beam & No Injection

2330-2400

Linac tests

Kuklev

Stored Beam & No Injection


Tuesday, March 22, 2022



0000-0700

Linac tests

Kuklev

Stored Beam & No Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection