Machine Studies

Draft Schedule for Run01-9, 2022

March 28st 0800 – March 29nd 0800



Time

Descriptions

Studiers

SR Status


Monday, March 28, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1000

Fill 100 mA 324 bunches

Ops

Stored Beam & Injection

1000-1100

Investigate PAR RF-12 blower

RF Group

Access PAR

1000-1300

GUI for APS-U BPLD verification on ID27 P0s

Shang Emery Bui Smith

Stored Beam & Injection Later

1300-1330

Dimtel checkout for 24 bunches

Emery

Stored Beam & Limited Injection

1300-1500

Injector training. Fill 24 bunches initially

Hotham/Smith

Stored Beam &Limited Injection

1500-2000

High charge injection into booster

Calvey Harkay

Stored Beam & No Injection

2000-2300

Booster bypass beam dump studies

Wootton

Stored Beam & No Injection

2300-0000

Orbit switch from hybrid mode to 24 bunches

Yipeng

Stored Beam & Injection


Tuesday, March 29, 2022



0000-0300

Orbit switch from hybrid mode to 24 bunches

Yipeng

Stored Beam & Injection

0300-0700

Open


Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection