Draft Schedule for Run03-1, 2022

Sept 6th 0800 – Sept 13st 0800



Time

Descriptions

Studiers

SR Status


Sunday, Sept. 4th, 2022 - Prestudies



Any time

Test PEM for 1 Hz/2 Hz switching and make 1 Hz injector UBOP files

Shang Fystro Harkay Calvey

No Beam & 1 Hz Injection




No Beam




No Beam


Monday, Sept. 5th, 2022 - Prestudies



0800-1000

Possible booster training


No Beam & 2 Hz Injection

1000-1600

booster LOCO measurement near extraction

Yao Shang

No Beam & 2 Hz Injection




No Beam


Tuesday, Sept. 6th, 2022



0800-1000

MPS Validations

Smith/Flood

Stored Beam & 2 Hz Injection

1000-1100

Tune timing PVs (BTS:ICT and the booster extraction kicker)

Hong

Stored Beam & 2 Hz Injection

1000-2400

RF Conditioning with Beam (24 singlets)

Flood/OPS

Stored Beam & 2 Hz Injection


Wednesday, Sept. 7th, 2022



0000-0200

RF Conditioning with Beam (24 singlets)

Flood/OPS

Stored Beam & 2 Hz Injection

0200-0600

BPLD validations; X-ray bpm checks

Sereno

Stored Beam & 2 Hz Injection

0600-0900

Lattice and Dimtel checkout

Emery Yipeng

Stored Beam & 2 Hz Injection

0900-1100

BCM timing investigation with only 1 bunch in the SR. Check MRF robustness.

Hong

Stored Beam & 2 Hz Injection

1100-1300

Radiation study on RF coupler, including Zone F accesses before and after.

Health Physics, Horan

Zone F access
Stored Beam & 2 Hz Injection

1300-1400

troubleshoot the Booster cavity 4 tuning loop

Berenc, Smith

Stored Beam & 1 Hz Injection

1300-1400

Train operators to switch 1 Hz/2 Hz

Fystro

Stored Beam & 1 Hz Injection

1400-1600

Adjust PAR bunch cleaning for 1 Hz

Yao Fystro

Stored Beam & 1 Hz Injection

1600-1700

Adjust PAR extraction timing for 1 Hz to center wfms and beam on PAR Scope

Yao Harkay

Stored Beam & 1 Hz Injection

1700-1900

Verify correct bucket targeting at 1 Hz fill from zero

Emery Harkay

Stored Beam & 1 Hz Injection

1900-2400

Investigate S37 cavities to determine which one is outgassing

Emery Harkay

Stored Beam & 2 Hz Injection


Thursday, Sept. 8th, 2021



0000-0800

Open



0800-1200

Commission booster SLM3 (2 Hz)

Calvey Wootton Dooling

Stored Beam & No Injection

1200-1500

Linac K2 software development I. Fill 324 bunches for SR (2 Hz)

Fystro, Soliday

Stored Beam & No Injection

1500-2100

Unified Feedback test, 324 bunches

Kallakuri, Sereno, Brill

Stored Beam & 2 Hz Injection

1530-1730

Booster tune up in parallel to above. 1 Hz or 2 Hz

Calvey

Stored Beam & Injection

2100-2300

Verify bunch purity at 1 Hz

Yipeng Harkay

Stored Beam & 1 Hz Injection

2300-2400

Dimtel pick-up and kicker calibration

Emery

Stored Beam & 1 Hz Injection


Friday, Sept. 9th, 2022



0000-0100

Dimtel pick-up and kicker calibration

Emery

Stored Beam & 1 Hz Injection

0100-0800

S25ID XBPM Calibration. 324 bunches 100 mA.

Yang

Stored Beam & 2 Hz Injection

0800-1100

Test the injtime DG645s. First run injection and get a snap shot of injection efficiency and timing setting. Reboot iocinjtime with the DG645s and run injection again. 2 Hz

Hong

Stored Beam & Injection

1100-1400

SR BPM offsets. 324 bunches 100 mA refill.

Yipeng

Stored Beam & No Injection

1100-1400

Linac L5/6 RF system and the RF read back system test with the new timing system

Hong, RF group, Fystro

Stored Beam & No Injection

1400-1800

Fix storing ring injection efficiency calculation for 1 Hz

Yao Shoaf

Stored Beam & 1Hz Injection

1800-2400

RF conditioning from 60 mA

Ops

Stored Beam & 1Hz Injection


Saturday, Sept. 10th, 2022



0000-1000

RF conditioning

Ops

Stored Beam & Injection

1000-1100

Linac RFG kicker test with the new timing system (2 Hz)

Hong

Stored Beam & No Injection

1100-1600

Orbit Recovery from 324 bunch UBOP to 24 bunches.

Yipeng

Stored Beam & 1 Hz Injection

1600-2000

IEX/CPU checkout. 324 bunches. (2 Hz)

Emery Yipeng

Stored Beam & 2 Hz Injection

2000-2400

IEX/CPU correction if necessary. 324 bunches

Emery

Stored Beam & (2 Hz) Injection


Sunday, Sept. 11th, 2022



0000-0400

Top-up verification at 1 Hz

Kuklev Harkay

Stored Beam & 1 Hz Injection

0400-0800

Top-up verification at 2 Hz

Kuklev Harkay

Stored Beam & 2 Hz Injection

0800-1100

Open

Hong

Stored Beam & No Injection

1100-1400

Linac K2 software development II. 2 Hz

Fystro, Soliday

Stored Beam & No Injection

1400-1600

Abort kicker checkout

Yipeng

Stored Beam & 1 Hz Injection

1600-2000

Final lattice checkout

Emery/Yipeng

Stored Beam & 1 Hz Injection

2000-2400

Bunch purity verification

Yipeng Harkay

Stored Beam & 1 Hz Injection


Monday, Sept. 12th, 2022



0000-0600

6 GeV Stability. 1 or 2 Hz.

Emery

Stored Beam & Injection

0800-1800

IETS

Wienans, Fors

Stored Beam & 1Hz Injection

1800-2400

Final set-up of bunch purity monitor and pinhole camera, measure sector P1 offset

Yang Yipeng

Stored Beam & 1 Hz Injection

1800-1900

Steering software checkout, as permitted by above study

Emery Shang

Stored Beam & 1 Hz Injection


Tuesday, Sept. 13th, 2022



0000-0600

S28ID XBPM calibration study, 100 mA, top-up optional

Yang

Stored Beam & Injection

0600-0800

Prepare for User beam

OPS