Machine Studies
Draft Schedule for Run02-3, 2022
June 13th 0800 – June 14th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 13, 2022 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne |
Stored Beam & Injection |
0930-1130 |
Investigate RF-1 driver muting issue |
RF Group |
No Beam |
0930-1130 |
Modifications to the Booster-Extraction interlock PLC |
RF Group |
No Beam |
0930-1130 |
Replace the Gespac time card for S31A:S4 |
PS Group |
No Beam |
0930-1130 |
Troubleshoot water pump PLC errors |
Wright |
No Beam |
1000-1130 |
Add shield ferrites to Booster ICT |
Keane |
Access Booster |
1130-1200 |
Recover SR |
OPs |
Stored Beam & Injection |
1200-1300 |
Checkout of some of last week’s ID steerings; checkout of S31A:S4 if necessary |
Emery |
Stored Beam & Injection |
1300-1500 |
SR training |
Smith/Hotham |
Stored Beam & Injection |
1500-1700 |
BM BPLD study |
Bui, Shang, Emery |
Stored Beam & Injection |
1700-1900 |
Align the triggers of the old and new DG, align trigger to abort kicker |
Hong Yao |
Stored Beam & Injection |
1900-2200 |
Beam loss measurements at the SCUs with the abort kicker |
Harkay Dooling |
Stored Beam & Injection |
2200-2400 |
SR training |
Yipeng |
Stored Beam & Injection |
|
Tuesday, June 14, 2022 |
|
|
0000-0200 |
Checkout of some of last week’s ID steerings (continued) |
Emery |
Stored Beam & Injection |
0200-0700 |
Open |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |