Machine Studies

Draft Schedule for Run02-3, 2022

June 13th 0800 – June 14th 0800



Time

Descriptions

Studiers

SR Status


Monday, June 13, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection

0930-1130

Investigate RF-1 driver muting issue

RF Group

No Beam

0930-1130

Modifications to the Booster-Extraction interlock PLC

RF Group

No Beam

0930-1130

Replace the Gespac time card for S31A:S4

PS Group

No Beam

0930-1130

Troubleshoot water pump PLC errors

Wright

No Beam

1000-1130

Add shield ferrites to Booster ICT

Keane

Access Booster

1130-1200

Recover SR

OPs

Stored Beam & Injection

1200-1300

Checkout of some of last week’s ID steerings; checkout of S31A:S4 if necessary

Emery

Stored Beam & Injection

1300-1500

SR training

Smith/Hotham

Stored Beam & Injection

1500-1700

BM BPLD study

Bui, Shang, Emery

Stored Beam & Injection

1700-1900

Align the triggers of the old and new DG, align trigger to abort kicker

Hong Yao

Stored Beam & Injection

1900-2200

Beam loss measurements at the SCUs with the abort kicker

Harkay Dooling

Stored Beam & Injection

2200-2400

SR training

Yipeng

Stored Beam & Injection


Tuesday, June 14, 2022



0000-0200

Checkout of some of last week’s ID steerings (continued)

Emery

Stored Beam & Injection

0200-0700

Open



0700-0800

Prepare for User beam

OPS

Stored Beam & Injection