Machine Studies

Draft Schedule for Run02-7, 2022

July 11th 0800 – July 12th 0800



Time

Descriptions

Studiers

SR Status


Monday, July 11, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne

Stored Beam & Injection





0930-1030

ID25 work

Boron

A-E in controlled access

0930-1130

Troubleshoot S27AS1

Vargas

No Beam

0930-1130

Raw 36&37 T1 PLC IP configuration

Ruan

No Beam

0930-1130

Troubleshoot ACIS readback for K2

RF/SI Groups

No Injection

0930-1730

Install door frame in 412

Stevens

No Impact but may be vibrations

1000-1100

Install Booster ICT ground strap

Keane

Access Booster

1130-1200

Recover SR

Ops

Stored Beam & Injection

1200-1300

Booster training (07-15)

Ronzhin/Hotham

Limited Injection

1300-1500

Linac training (07-15)

Ronzhin/Weber

No Impact

1500-1700

Hybrid bunch limit checkout

Emery Yipeng

Stored Beam & Injection

1800-2300

Orbit switch to hybrid mode

Yipeng

Stored Beam & Injection

2300-0300

Tune FF repeat (6 Gev)

Emery

Stored Beam & Injection


Tuesday, July 12, 2022



0300-0700

Open


Stored Beam & Injection

0700-0900

Booster training

Ronzhin/Hotham

Limited Injection

0900-1300

booster chrom correction study (need to change rf frequency)

Yao Shang

No Beam

1300-1500

Linac training

Ronzhin/Weber

No Impact

1500-1900

Unified Feedback test (324 bunches)

Kallakuri, Sereno, Brill

Stored Beam & Injection

1900-1900

Re-fill 324 bunch beam in ring

Ops

Stored Beam & Injection

1900-0100

ML anomaly classification

Lobach

No Injection


Wednesday, July 13, 2022



0000-0400

Open



0400-6300

Final hybrid mode checkout (because there is always “something”)

Emery

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection