Machine Studies
Draft Schedule for Run03-1, 2022
September 30th 0800 – October 3, 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Friday, September 30, 2022 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Hahne/Sereno |
Stored Beam & Injection |
1000-1100 |
Update pump software |
Wright |
RF and some PS off |
1000-1100 |
Reboot iocs5fb iocs7fb |
Xu |
No Injection |
1000-1100 |
Reboot iocinjtime |
Hong |
No Injection |
1100-1200 |
Tune up PAR 1 Hz |
Harkay |
No Injection |
1200-1500 |
Investigate SR injection efficiency PVs |
Shoaf, Pietryla, Hong |
Stored Beam & Injection |
|
|
|
|
1500-1700 |
Checking out 1 Hz |
Harkay/OPS |
Stored Beam & Injection |
1700-1900 |
1Hz topup verification with compensated interval |
Ops |
Stored Beam & Injection |
1700-1900 |
1Hz bunch purity verification in parallel with above |
Yipeng |
Stored Beam & Injection |
1900-2100 |
Linac beam efficiency improvement |
Yine |
Stored Beam & No Injection |
2100-2300 |
Linac training |
Weber/Ronzhin |
Limited Injection |
2300-2400 |
6 GeV RHB-S7 checkout |
Emery |
Stored Beam & Injection |
|
Saturday, October 1, 2022 |
|
|
0000-0300 |
6 GeV RHB-S7-S35LoBetay setup |
Emery |
Stored Beam & Injection |
0300-0700 |
6 GeV RHB-S7-S35HiBetay set[up |
Emery |
Stored Beam & Injection |
0700-0900 |
Linac training |
Schiltz/Weyer |
Limited Injection |
0900-1500 |
S25ID XBPM1 (324 bunches – limited injection later) |
Yang |
Stored Beam & Injection |
1100-1300 |
Linac training |
Weber/Ronzhin |
Limited Injection |
1500-1700 |
S27ID XBPM2 (324 bunches refill – shutter enable) |
Yang and ID27 beamline |
Stored Beam & Injection |
1700-2000 |
Beam steering |
Yipeng |
Stored Beam & Injection |
2000-2200 |
Dimtel input and output calibration |
Emery |
Stored Beam & Injection |
2200-2400 |
S25ID XBPM1 and S27ID XBPM1/XBPM2 |
Yang |
Stored Beam & Injection |
|
Sunday, October 2, 2022 |
|
|
0000-0400 |
S25ID XBPM1 and S27ID XBPM1/XBPM2 |
Yang |
Stored Beam & Injection |
0400-0600 |
Harmonic tuner FF checkout for PAR 5nC 2Hz |
Harkay |
Stored Beam & No Injection |
0600-0800 |
Linac training |
Schiltz/Weyer |
Limited Injection |
0800-1200 |
RG1 tune up |
Yine |
Stored Beam & No Injection |
1200-1400 |
Measure bpm offsets around ID25 |
Yipeng |
Stored Beam & No Injection |
1200-1400 |
Linac training |
Weber/Ronzhin |
Limited Injection |
1400-2000 |
Check archiver connections |
Kuklev |
Stored Beam & Injection |
2000-2200 |
Bunch Purity checkout with 5 linac pulses, 2 Hz operations |
Yipeng/Harkay |
Stored Beam & Injection |
2200-2400 |
Open |
|
|
|
Monday, October 3, 2022 |
|
|
0000-0700 |
Open |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |