Machine Studies

Draft Schedule for Run03-4, 2022

October 24th 0800 – October 25th, 0800



Time

Descriptions

Studiers

SR Status


Monday, October 24, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne/Sereno

Stored Beam & Injection

0930-1030

Swap Moxa in S37

DiMonte

No Beam

0930-1130

RF waveguide switch

RF Group

No Beam

0930-1130

DLLRF work L4

Yang

No Injection

0930-1130

Troubleshoot 119Mhz signal to ITS

Meyer

No Injection

0930-1130

Swap S30A:P1 with a Bergoz board in sector 8 or 9 (move to next week)

Erwin

No Injection

0930-1130

Sola transformer in SR Kicker power supply in IK2

Harris/Vargas

No Injection

1000-1200

Tunnel rad measurements

Henry/IH

Access Zone A

1130-1200

Adjust timing of IK2 (Beam not needed)

Emery

Access Zone A

1200-1300

SR recovery.

Ops

Stored Beam & Injection

1300-1500

Linac training

Weber/Ronzhin

Limited Injection

1500-1700

Investigation of topup computations (1Hz/2Hz injections)

Shoaf Pietryla

Stored Beam & Injection

1700-1800

How “Retime P0” affects the MRF system

Hong

Stored Beam & Injection

1800-2100

Measure offset of S30A:P1 and center orbit through ID29 BPLD

Emery

Stored Beam & Injection

2100-2400

IEX checkout or ID FF for correctors

Yipeng

Stored Beam & Injection


Tuesday, October 25, 2022



0000-0300

Bunch purity measurements while kicking beam

Emery/Bingxin

Stored Beam & Injection

0300-0700

linac optimizer tests

Kuklev

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection