Machine Studies

Draft Schedule for Run03-5, 2022

October 31st 0800 – November 1st, 0800



Time

Descriptions

Studiers

SR Status


Monday, October 31, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Hahne/Sereno

Stored Beam & Injection

0930-1130

RF waveguide switch to RF3&4

RF Group

No Beam

0930-1130

Swap S3A:S3

Harris

No Beam

0930-1130

Investigate P:BM noise issue

Vanis

No Beam

0930-1130

Replace Sola transformer in SR IK4

Meier

No Beam

0930-1130

Jumper L1:RG1:RA2 communication

Puttkammer

No Beam

0930-1130

Move area detector to different VM

Grass

No Beam

1000-1200

Tunnel rad measurements

Henry/IH

Access Zone B

1130-1200

IK4 timing recovery by scope waveform

Emery

Access Zone B

1200-1300

SR recovery

OPs

Stored Beam & Injection

1300-1700

Orbit switch to 324 bunches

Yipeng

Stored Beam & Injection

1700-2100

linac optimizer tests

Kuklev

Stored Beam & Injection

2100-2300

Linac training

Weyer/Schiltz

Limited Injection

2300-2400

BTS dispersion measurement with rf frequency method

Yao, Shang

No stored beam


Tuesday, November 1, 2022



0000-0200

BTS dispersion measurement with rf frequency method

Yao, Shang

No stored beam

0200-0500

Dimtel bunch cleaning (6 GeV?)

Emery

Stored Beam & Injection

0500-0700

SR training

Hotham/Berkland

Stored Beam & Injection

0700-0800

Prepare for User beam (324 bunches)

OPS

Stored Beam & Injection