Machine Studies
Draft Schedule for Run03-7, 2022
November 14th 0800 – November 16th, 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 14, 2022 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
0930-1130 |
Replace RF amplifier in S35 |
Diag group |
No beam |
0930-1330 |
Install RF gun in ITS |
Waldschmidt |
No Injection |
0930-1330 |
Booster lead stacking outside tunnel |
Moonier |
No Injection |
1000-1100 |
Checkout GainAO setup for datapool |
Shang |
Authorized Access Zone D |
1000-1200 |
25ID PSS testing |
Boron |
Authorized Access Zone D |
1000-1200 |
Tunnel rad measurements |
Henry/IH |
Authorized Access Zone D |
1000-1400 |
APS-U survey network ties |
Jansma |
Authorized Access Zone D |
1400-1500 |
SR recovery |
Ops |
Stored Beam & Injection |
1500-1700 |
1Hz/2Hz topup calculation studies |
Shoaf, Pietryla, Fystro |
Stored Beam & Injection |
1700-2100 |
test Spark splitters in sector 27 and LB+ single pass feature |
Brill Sereno |
Stored Beam & Injection |
2100-2200 |
Single bunch limit Dimtel |
Emery |
Stored Beam & Injection |
2200-2400 |
Orbit switch to hybrid |
Yipeng |
Stored Beam & Injection |
|
Tuesday, November 15, 2022 |
|
|
0000-0300 |
Orbit switch to hybrid |
Yipeng |
Stored Beam & Injection |
0300-0730 |
ML data collection |
Kuklev |
Stored Beam & Injection |
0730-1130 |
Install RF gun in ITS |
Waldschmidt |
No Injection |
0800-1000 |
APS-U FE water header measurements |
Clute |
Access Zone A |
0800-1000 |
Tunnel rad measurements |
Henry/IH |
Access Zone E |
1000-1100 |
SR recovery |
Ops |
Stored Beam & Injection |
1100-1300 |
SR training |
Berkland/Hotham |
Stored Beam & Injection |
1300-1900 |
27-ID XBPM2 studies with beamline users (open shutter for ID27 – need floor coordinator) |
Yang |
Stored Beam & Injection |
1900-2400 |
unified feedback studies in sector 27-28, 324 bunches |
Kallakuri, Brill, Sereno |
Stored Beam & Injection |
|
Wednesday, November 16, 2022 |
|
|
0000-0430 |
ML data collection |
Kuklev |
Stored Beam & Injection |
0430-0630 |
Linac training |
Ronzhin/Weber |
Limited Injection |
0630-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |