Machine Studies

Draft Schedule for Run03-7, 2022

November 14th 0800 – November 16th, 0800



Time

Descriptions

Studiers

SR Status


Monday, November 14, 2022



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

0930-1130

Replace RF amplifier in S35

Diag group

No beam

0930-1330

Install RF gun in ITS

Waldschmidt

No Injection

0930-1330

Booster lead stacking outside tunnel

Moonier

No Injection

1000-1100

Checkout GainAO setup for datapool

Shang

Authorized Access Zone D

1000-1200

25ID PSS testing

Boron

Authorized Access Zone D

1000-1200

Tunnel rad measurements

Henry/IH

Authorized Access Zone D

1000-1400

APS-U survey network ties

Jansma

Authorized Access Zone D

1400-1500

SR recovery

Ops

Stored Beam & Injection

1500-1700

1Hz/2Hz topup calculation studies

Shoaf, Pietryla, Fystro

Stored Beam & Injection

1700-2100

test Spark splitters in sector 27 and LB+ single pass feature

Brill Sereno

Stored Beam & Injection

2100-2200

Single bunch limit Dimtel

Emery

Stored Beam & Injection

2200-2400

Orbit switch to hybrid

Yipeng

Stored Beam & Injection


Tuesday, November 15, 2022



0000-0300

Orbit switch to hybrid

Yipeng

Stored Beam & Injection

0300-0730

ML data collection

Kuklev

Stored Beam & Injection

0730-1130

Install RF gun in ITS

Waldschmidt

No Injection

0800-1000

APS-U FE water header measurements

Clute

Access Zone A

0800-1000

Tunnel rad measurements

Henry/IH

Access Zone E

1000-1100

SR recovery

Ops

Stored Beam & Injection

1100-1300

SR training

Berkland/Hotham

Stored Beam & Injection

1300-1900

27-ID XBPM2 studies with beamline users (open shutter for ID27 – need floor coordinator)

Yang

Stored Beam & Injection

1900-2400

unified feedback studies in sector 27-28, 324 bunches

Kallakuri, Brill, Sereno

Stored Beam & Injection


Wednesday, November 16, 2022



0000-0430

ML data collection

Kuklev

Stored Beam & Injection

0430-0630

Linac training

Ronzhin/Weber

Limited Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection