Machine Studies
Draft Schedule for Run01-1, 2023
Jan 23th 0800 – Jan 31st 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, Jan 23, 2023 - Prestudies |
|
|
0800-1000 |
MPS Validations |
CTLS/Ops |
No Injection |
1000-1200 |
Assess Nb3Sn chamber aperture 25 mA (3.3.1.1 of Nb3Sn commissioning plan) |
Emery |
Stored Beam & Injection |
1200-2400 |
RF Conditioning with Beam to 115 mA (24 singlets) |
RF/Ops |
Stored Beam & Injection |
1200-2400 |
Nb3Sn transparency tests with beam accumulation (3.3.2.1 3.3.2.2 of Nb3Sn CP) |
Yipeng |
Stored Beam & Injection |
1200-2400 |
S37 scraper transparency tests with beam accumulation (n.n.n.n of S37scraper CP) |
Yipeng |
Stored Beam & Injection |
~1500 |
Pinhole camera initial set-up (above 50 mA) parallel to RF conditioning |
Yang |
Stored Beam & Injection |
~1600 |
BCM Gen 3 checkout |
Emery |
Stored Beam & Injection |
~1700 |
BPM checkout (parallel to RF conditioning) |
Sereno |
Stored Beam & Injection |
|
Tuesday, Jan 24, 2023 |
|
|
0000-0800 |
Open if needed for continued RF conditioning with beam |
RF/Ops |
Stored Beam & Injection |
1000-2130 |
Resume RF Conditioning with Beam to 115 mA (24 singlets) |
RF/Ops |
Stored Beam & Injection |
2130-0030 |
BPLD validations plus X-BPM sanity check |
Sereno |
Stored Beam & Injection |
|
Wednesday, Jan 25, 2023 |
|
|
0030-0130 |
Setup Dimtel timing |
Emery Yipeng |
Stored Beam & Injection |
0130-0330 |
Lattice set up [not done] |
Emery |
Stored Beam & Injection |
0330-0730 |
Orbit recovery [moved to later] |
Yipeng |
Stored Beam & Injection |
0730-1000 |
Accumulation limits checks with Nb3Sn off (3.3.2.3 of Nb3Sn CP) and with S37 scraper (n.n.n.n of scraper CP) [Done earlier at 0400] |
Emery |
Stored Beam & Injection |
1000-1200 |
Accumulation with Nb3Sn on (3.3.3.1) |
Yipeng |
Stored Beam & Injection |
1200-1400 |
beam dump test with Nb3Sn on (3.3.3.2) |
Dooling |
Stored Beam & Injection |
1400-1800 |
Tune measurement testing with Dimtel processor |
Kallakuri, Sereno |
Stored Beam & Injection |
1800-2200 |
RG1 study #1 |
Yine, Lobach, Dooling, Fystro |
Stored Beam & No Injection |
2200-2400 |
S25ID GRID-XBPM New detector calibration |
Yang |
Stored Beam & Injection |
|
Thursday, Jan 26, 2021 |
|
|
0000-0600 |
S25ID GRID-XBPM New detector calibration |
Yang |
Stored Beam & Injection |
0600-1200 |
Dosimetry on turbo pump near Septum (zone F). See items below. |
Vacuum, Henry |
Various |
0600-0730 |
Zone F access for dosimetry |
Vacuum, Henry |
Access Zone F |
0730-0800 |
Run beam into SR septum for dosimetry |
Ops |
Stored Beam & Injection |
0800-1200 |
Accesses into SR (one in Zone F) |
|
Access Zone F |
0830-1130 |
HSCU liquid He flow work/NbSCU photo op |
MD Group |
Access Zone A |
0800-1200 |
Recover turbo pump dosimeters |
Vacuum, Henry |
Access Zone F |
0800-1000 |
PSS end-to-end tests |
Boron |
No Beam & No Injection |
0800-1200 |
Linac K2 DLLRF test without beam, part I |
Yawei, Pietryla, Fystro |
No Beam & No Injection |
0800-1200 |
Booster dipole current tests |
Calvey, Puttkammer, Shang |
No Beam & No Injection |
1230-1730 |
PAR digital LLRF for injection into booster |
Berenc, Calvey, Fystro |
Stored Beam & Injection |
1730-2130 |
RG1 study #2 |
Yine, Lobach, Dooling, Fystro |
Stored Beam & No Injection |
1730-1830 |
SR Kicker waveform recording |
Emery |
Stored Beam & No Injection |
2130-2400 |
S25ID new XBPM calibration |
Yang |
Stored Beam & Injection |
|
Friday, Jan 27, 2023 |
|
|
0000-0800 |
S25ID XBPM cross talk and thermal Drift |
Yang |
Stored Beam & Injection |
0800-1200 |
Linac K2 DLLRF test without beam, part II |
Yawei, Pietryla, Fystro |
Stored Beam & No Injection |
1200-1215 |
Refill ring 324 bunches |
|
|
1200-1600 |
|
Yipeng |
Stored Beam & Injection |
1215-1600 |
Booster tune up |
Calvey |
No injection |
1600-1800 |
Orbit recovery |
Yipeng |
|
1800-2200 |
Nb3Sn beam perturbations (3.3.3.4 in Nb3Sn CP) |
Emery |
Stored Beam & Injection |
2200-0200 |
PAR P2IK tuning |
Harkay |
Stored Beam & No Injection |
|
Saturday, Jan 28, 2023 |
|
|
0200-0500 |
Open |
|
Stored Beam & Injection |
0500-0900 |
|
|
Stored Beam & Injection |
0900-1500 |
Linac K2 DLLRF test with beam |
Yawei, Pietryla, Fystro, Yin-e |
Stored Beam & Injection |
1500-2400 |
Orbit control for Nb3Sn with xbpms (3.3.4 in Nb3Sn CP) |
Emery Yipeng Shang |
Stored Beam & Injection |
|
Sunday, Jan 29, 2023 |
|
|
0000-1300 |
25-ID-FE XBPM coupling, thermal stability/drift |
Bingxin |
Stored Beam & Injection |
1300-1700 |
1Hz checkout |
Harkay |
Stored Beam & Injection |
1700-1800 |
Open
|
|
Stored Beam & Injection |
1800-2100 |
Dimtel feedback self-training |
Yipeng |
Stored Beam & Injection |
2100-2400 |
Open |
|
Stored Beam & Injection |
|
Monday, Jan 30, 2023 |
|
|
0000-0100 |
SCU1 FF checkout |
|
Stored Beam & Injection |
0100-0300 |
Open |
|
Stored Beam & Injection |
0300-0600 |
Linac ML studies |
Kuklev |
Stored Beam & No Injection |
0600-1000 |
RG1 study |
Yine |
Stored Beam & No Injection |
1000-1200 |
|
|
Stored Beam & Injection |
1200-1600 |
Final lattice checkout |
Emery |
Stored Beam & Injection |
1800-2400 |
Final set-up of bunch purity monitor (3 h) and pinhole camera (3 h) |
Yang/Yipeng |
Stored Beam & Injection |
|
Tuesday, Jan 31, 2023 |
|
|
0000-6300 |
ID25 xbpm data redo |
Yang |
Stored Beam & Injection |
0630-0800 |
Prepare for User beam |
OPS |
|