Machine Studies

Draft Schedule for Run01-12, 2023

April 17th 0800 – April 23rd 0000



Time

Descriptions

Studiers

SR Status


Monday, April 17, 2023



0800-0830

Open time, shutters open
Move IDs to 40 mm?

OPS, Smith

Stored Beam & Injection

0830-0835

Final closure of shutters

Smith Borland

Stored Beam

0835-0905

Setup 6 GeV BTS and SR, RHB-S7S37, demonstrate injection

Emery

Stored Beam & Injection

0905-2000

IETS

Uli, Fors

Stored Beam & Injection

2000-2400

IETS

Uli, Fors

Stored Beam & Injection


Tuesday, April 18, 2023



0000-0800

Open time. Injector may not be usable

OPS

Stored Beam & Injection

0800-2000

IETS

Uli, Fors

Stored Beam & Injection

0900-1500

Reboot xray bpm iocs in S25 S28 for new PVs. Not supposed to affect SR operation.

Shifu, Yang

Stored Beam & Injection

2000-2400

IETS

Uli, Fors

Stored Beam & Injection


Wednesday, April 19, 2023



0000-0400

360 Hz + 60 Hz suppression, RF4 only, 100 mA, booster ramp occasionally turned off, could be moved 4h earlier

Berenc, Emery

Stored Beam & Injection

0400-0800

Dimtel Tune Measurement, vary coupling, tunes, 324 bunches and 24 bunches, 100 mA

Kallakuri, Emery

Stored Beam & Injection

0400-0800

GridX bpm calibration, ID25, shutters closed, 100 mA

Yang

Stored Beam & Injection

0400-0800

BTS BESOCM, booster running

Keane, Sereno

Stored Beam & Injection

0800-2000

IETS

Uli, Fors

Stored Beam & Injection

2000-2400

IETS

Uli, Fors

Stored Beam & Injection


Thursday, April 20, 2023



0000-0800

S37 scraper, 200 mA, shutters closed

Dooling, Borland, Emery

Stored Beam & Injection

0800-2000

IETS

Uli, Fors

Stored Beam & Injection

2000-2400

Early start of S37 scraper

Dooling, Borland, Emery

Stored Beam & Injection


Friday, April 21, 2023



0000-0800

S37 scraper, RF3+RF4, 200 mA

Dooling, Borland, Emery

Stored Beam & Injection

0400-0800

S37 scraper beam aborts

Dooling, Borland, Emery, HP

Stored Beam & Injection

0800-2000

IETS

Uli, Fors

Stored Beam & Injection

2000-2400

360 Hz + 60 Hz suppression, RF4 only, 100 mA

Berenc, Emery

Stored Beam & Injection


Saturday, April 22, 2023



0000-0400

BMX 9BM, GRIDx bpm, ID28, 100 mA decay, 324 bunches

Yang

Stored Beam & No Injection

0000-0400

Adaptive BO on linac

Kuklev

Stored Beam & No Injection

0400-0800

BMX 9BM, GRIDx bpm, ID28, 100 mA top-up, 324 bunches (continued)

Yang

Stored Beam & Injection

0400-0800

test linac interleaving lite

Yine

Stored Beam & Injection

0800-2000

IETS

Uli, Fors

Stored Beam & Injection

2000-2400

S37 scraper, wake field measurements

Dooling, Borland, Emery

Stored Beam & Injection


Sunday, April 23, 2023



0000-0800

SCU1 spectrum, 100 mA 324 bunches, no top-up, shutters open

Emery, Shastri

Stored Beam & Injection

0800-2400

IETS

Uli, Fors

Stored Beam & Injection

2000-2400

MOBO/SOBO on SR lattice RHB-S7S37

Kuklev, Emery, Shang

Stored Beam & Injection



Time

Optional SR studies
not allocated yet

Studiers

SR Status

4 h

MOBO on SR lattice RHB-S7S37

Kuklev, Emery, Shang

Stored Beam & Injection

4 h

Adaptive BO on linac

Kuklev

Any

4 h

test linac interleaving lite

Yine

Any

4 h

Possible high charge in booster

Calvey

Any