Machine Studies

Draft Schedule for Run01-2, 2023

February 6th 0800 – February 7th 0800



Time

Descriptions

Studiers

SR Status


Monday, February 6, 2023



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Sereno

Stored Beam & Injection

0930-0945

Switch to 1 Hz, verify with PAR beam

Ops

No beam

1000-1130

Pinhole camera repair

Wright

Access Zone E

1030-1330

Authorized access to linac/PAR (to cover the multiple work requests below)

Ops

Access Zone E
Linac/PAR Access

0930-1130

S18:19 communication error

Yang Ruan

No Beam

0930-1130

Troubleshoot S4B:Q1

Vargas

No Beam

1000-1400

Booster BM tests (1 Hz)

Calvey/Shang

Access Zone E
Linac Access/PAR

0930-1230

Troubleshoot SR RF-3

Trento

No Beam

1000-1330

Inspect rf gun and alpha magnet beam lines at rg1 and rg2

Waldschmidt

Access Zone E
Linac/PAR Access

1000-1130

Repair ITS YAG1

Berg

Access Zone E
Linac/PAR Access

1000-1130

Swap digital LLRF at K2. Check with beam later.

Yawei

Access Zone E
Linac/PAR Access

1130-1330

Troubleshoot linac FS3

Dombrowski

Access Zone E
Linac/PAR Access

1130-1330

Align PAR bypass cube4 and inspect PAR FL4

Berg

Access Zone E
Linac/PAR Access

1345-1500

SCU1 measurement, shutter closed

Emery

Stored Beam & Injection

1500-1800

SCU1 beam with shutters open

Emery

Stored Beam & Injection

1800-2200

RG1 (start with 1 Hz and end with 1 Hz)

Yine, Fystro, Ihar

Beam and No Injection

2200-0100

PAR efficiency

Ihar, Yao

Beam and No Injection


Tuesday, February 7, 2023



0100-0300

Topup 1 Hz verification

Ops

Stored Beam & Injection

0300-0500

Linac training

Novencido/ LaBuda

Limited Injection

0500-0700

Bunch Purity (1 Hz)

Yipeng, Harkay

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection