Machine Studies
Draft Schedule for Run01-8, 2023
March 20th 0800 – March 21th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 20, 2023 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Sereno |
Stored Beam & Injection |
0930-1030 |
Refresh SF6 |
Vac Group |
No Injection |
0930-1130 |
K2 medm investigation and disconnect work |
Meyer |
No Injection K1-K3 down |
0930-1130 |
Test the DLLRF reading when in K2 down mode (coordinate with Meyer) |
Yawei |
No Injection |
0930-1130 |
Repair water leak at K5 SLED |
MOM |
No injection |
1000-1100 |
RF group measurements APS-U |
Weinands/RF Group |
Access Zone F |
1000-1130 |
APS-U contractor tours |
Sajaev/ Erdman |
Authorized Access Zone A |
1000-1200 |
Johnson controls work |
Wright |
No Beam S15-22 PS at zero |
1200-1300 |
SR magnet recovery. Inject 24 bunches if possible. Dimtel recovery 24-bunch reference file. |
Ops |
Limited Injection |
1200-1300 |
S37 scraper conditioning (if beam is available) |
Dooling |
Stored Beam & Injection |
1200-1400 |
Linac training (07-15) |
LaBuda/ Novencido |
Limited Injection |
1400 |
Inject 24 bunches if possible |
Ops |
Limited Injection |
1400-1600 |
Linac console |
Schiltz/Fystro |
Limited Injection |
1600-1800 |
LEA beam commissioning with HP |
Yine Wootton HP |
No Injection |
1800-2100 |
Gun beam to BB. no HP |
Yine Wootton |
No Injection |
2100-0100 |
24-bunch orbit recovery |
Yipeng |
Stored Beam & Injection |
|
Tuesday, March 21, 2023 |
|
|
0100-0500 |
6 GeV RHB-S7S37 scraper lattice optics correction |
Emery |
Stored Beam & Injection |
0500-0700 |
SCU1 external correctors (C:H1 C:V1) |
Emery |
Stored Beam & Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |