Machine Studies
Draft Schedule for Run01-9, 2023
March 27th 0800 – March 28th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 27, 2023 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0900--1600 |
Install IDs at 13ID |
MD |
Access Zone B |
1000-1130 |
APS-U contractor tours |
Erdman |
Authorized Access Zone B |
1000-1200 |
Johnson controls work |
Wright |
No Beam S23-30 PS at zero |
0815-1015 |
Testing the new Linac timing system with the Linac BPMs |
Hong |
Limited Injection |
0900-1300 |
PAR Harm SSA, high charge |
Smith, Harkay, Calvey |
Limited Injection |
1300-1500 |
Linac training (07-15) |
LaBuda/ Novencido |
Limited Injection |
1500-1700 |
Booster training (15-23) |
Weber/Ronzhin |
Limited Injection |
1700-1730 |
SR recovery (ID work is supposed to finish at ~1600h) |
Ops |
Stored Beam & Injection |
1730-1800 |
ID13 BPLD verification |
Sereno |
Stored Beam & Injection |
1730-1900 |
S37 scraper conditioning, topup |
Dooling |
Stored Beam & Injection |
1900-2100 |
SCU1 external correctors, topup |
Emery |
Stored Beam & Injection |
2100-2400 |
ABO study in linac |
Kuklev |
Stored Beam & Injection |
|
Tuesday, March 28, 2023 |
|
|
0000-0300 |
6 GeV RHB-S7S37 scraper lattice optics |
Emery |
Limited Injection |
0300-0500 |
Stripline Kicker measurement using Dimtel |
Emery |
Stored Beam & Injection |
0500-0700 |
Linac training (23-07) |
Weyer/Schiltz |
Limited Injection |
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |