Schedule for Run24-2, 2024
September 9th 0800 – September 16th, 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, September 9, 2024 |
|
|
0800-1200 |
MPS validations, Main and BM BPLDs |
Bui, M. Smith, Shang |
Stored Beam & Injection |
1200-1600 |
RF conditioning with beam – 162 bunches try for more 120 mA. Decide on RF voltage |
Emery |
Stored Beam & Injection |
1200-1600 |
Look for ion effects |
Calvey |
Stored Beam & Injection |
1200-1600 |
Verify logging of PSD; check orbit stability |
Borland |
Stored Beam & Injection |
1600-2000 |
Check super-slow 3-second kick-out using >5 nC bunches |
Harkay |
Stored Beam & Injection |
1600-2000 |
Check trajectory PVs; Measure Optics (< 11 mA) |
Emery |
Stored Beam & Injection |
2000-2400 |
Finish any pem testing in injectors |
Fystro |
Limited Injection |
|
Tuesday, September 10, 2024 |
|
|
0000-0300 |
Septum FF with trajectory data collection |
Mohsen Emery |
Stored Beam & Injection |
0300-0800 |
Debug non-linear optimization |
Kuklev |
Stored Beam & Injection |
0800-1600 |
BLS quench detection |
Berenc, Kelly, Horan |
Stored Beam & Injection |
1600-1800 |
SR Hands on training |
Emery, COs |
Stored Beam & Injection |
1800-2100 |
LFB timing check |
Brill, Kallakuri |
Stored Beam & Injection |
2100-2400 |
Correct Optics due to ATL, if necessary |
Sajaev |
Stored Beam & Injection |
|
Wednesday, September 11, 2024 |
|
|
0000-0600 |
Open |
|
Stored Beam & Injection |
0600-0800 |
SR Hands on training |
Emery, COs |
Stored Beam & Injection |
0800-1200 |
New IES firmware for target bunch tracking |
Wang |
Stored Beam & Injection |
1200-1600 |
PAR kicker noise suppression |
T. Smith |
Stored Beam & No Injection |
1200-1600 |
Validation of Swap-out software update |
Borland |
Stored Beam & No Injection |
1600-2100 |
MOFB, strive for speed |
Borland Arnold |
Limited Injection |
2100-2400 |
BPM dependency study |
Weixing |
Stored Beam & Injection |
|
Thursday, September 12, 2024 |
|
|
0000-0300 |
BPM dependency study |
Weixing |
Stored Beam & Injection |
0300-0800 |
Non-linear Optimization |
Kuklev |
Stored Beam & Injection |
0800-1200 |
Access into Linac |
OPS |
No Beam |
0800-1200 |
M1 firmware update |
PS group |
No Beam |
1200-1600 |
MOFB optimizations |
Borland Emery Shang |
Stored Beam & Injection |
1600-2400 |
BLS cavity conditioning |
Berenc Wienands Kelly |
Stored Beam & Injection |
|
Friday, September 13, 2024 |
|
|
0000-0400 |
BPM single-pass dependency study, part I |
Weixing |
Stored Beam & Injection |
0400-0800 |
Open |
|
Stored Beam & Injection |
0800-1200 |
ID BPLD Validation (Part II of MPS validations). Slow OFB is ok. |
Bui, M. Smith, Shang |
Stored Beam & Injection |
1200-1400 |
Steering & MOFB training |
Emery, COs, Calvey |
Stored Beam & Injection |
1400-2000 |
RG1 studies |
Sun |
Stored Beam & No Injection |
2000-2400 |
Booster tuner operation modes |
Calvey Berenc |
Stored Beam & Limited Injection |
|
Saturday, September 14, 2024 |
|
|
0000-0400 |
|
|
Stored Beam & Injection |
0000-0400 |
Check new ID steering knobs |
Emery |
Stored Beam & Injection |
0400-0600 |
|
|
Stored Beam & Injection |
0600-1200 |
Non-linear Optimization |
Kuklev |
Stored Beam & Injection |
1200-1400 |
|
Harkay |
Stored Beam & Limited Injection |
1400-2000 |
|
Kuklev, OPS |
Stored Beam & Injection |
2000-2400 |
BPM single-pass dependency study, part II |
Weixing |
Stored Beam & Injection |
|
Sunday, September 15, 2024 |
|
|
0000-0600 |
Vacuum conditioning to 110 mA |
Emery, OPS |
Stored Beam & Injection |
0600-1400 |
PAR beam loading |
Harkay |
Stored Beam & Injection |
1400-1800 |
RF voltage FF |
Borland Emery |
Stored Beam & Injection |
1800-2400 |
RG1 studies |
Sun |
Stored Beam & Injection |
|
Monday, September 16, 2024 |
|
|
0000-0600 |
HOM measurements |
Emery Kallakuri |
Stored Beam & Injection |
0600-0800 |
Prepare for User Beam Operations 100 mA – 162 bunches |
OPS |
Stored Beam & Injection |