Machine Studies
Draft Schedule for Run03-1, 2024
October 7 0800 – October 8 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 7, 2024 |
|
|
0900-1000 |
Install circulator at K4 |
Yang |
No Injection |
0900-1000 |
Test IEX code |
Smith |
No Beam |
0900-1000 |
Unlock shutters |
Wayman/MOM |
Zone C AA |
0900-1000 |
Repair thermocouples |
Weghorn |
Access Zone C |
0900-1000 |
Check magnet serial number |
Sun |
Access ITS |
0900-1000 |
Connect L1:P0 to scope |
Brill |
No Injection |
0900-1000 |
Check ITS BPM cables |
Erwin |
Access ITS |
0900-1100 |
Condition K6 |
Meyer |
No Injection |
0900-1100 |
DCCT measurements |
Fors |
No Beam |
1000-1100 |
Repair thermocouples |
Weghorn |
Access Zone B |
1000-1200 |
Investigate K1 instability |
Yang |
No Injection |
1100-1300 |
H-coll controller |
Wang |
No beam |
1200-1400 |
Recover SR, i.e. standardize, check tunes, measure response matrix, chromaticity |
Ops/Emery |
Stored beam & Injection |
1300-1500 |
Adjust and test timing improvements to the SR DCCT trigger (shared beam) |
Fors |
Stored beam & Injection |
1500-1800 |
BLS setup for operations for 100 mA |
Uli, Berenc, Kelly, Fuerst, Lindberg |
Stored Beam & Injection |
1800-2200 |
MOFB tests with additional BPMs |
Borland |
Stored Beam & Limited Injection |
1800-2200 |
Set up higher harmonic gap voltage in PAR |
Harkay, Mohsen, Sun |
Stored Beam & Limited Injection |
2200-2400 |
LFB tuning |
Uli, Kallakuri, Cheng, Emery |
Stored Beam & Injection |
|
Tuesday October 8, 2024 |
|
|
0000-0300 |
LFB tuning |
Uli, Kallakuri, Cheng, Emery |
Stored Beam & Injection |
0300-0400 |
Test ID intensity optimization software with beam and xray bpm readings |
Shang |
Stored Beam & No Injection |
0300-0600 |
Injector training (18-06) |
Ops |
Stored Beam & No Injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & Injection |