Machine Studies
Draft Schedule for Run03-2, 2024
October 14 0800 – October 16 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 14, 2024 |
|
|
0800-0900 |
Reboot sioc2mofbagg |
Arnold |
No Beam |
0800-0900 |
Power cycle Liberas in sector 3-4. Follow up on problem of 0200h Sunday |
Brill |
No Beam |
0800-0900 |
TBTDAQ IOC update |
Chandler |
No Beam |
0800-0900 |
Test H-coll |
Grass |
No Beam |
0800-0900 |
Test bi-polar PS comm loss |
Fors |
No Beam |
0800-0930 |
Injector training |
Ops |
Limited Injection |
0800-1000 |
Linac K2 shutdown |
Meyer |
No Beam |
0800-1000 |
Test gap switch PEM |
Berkland, Shang |
No Beam |
0800-1000 |
Reboot ioc2s40ctrl1 |
Hong |
No Beam |
0800-1000 |
Test AGC control |
DiMonte |
No Beam |
0900-1000 |
Unlock 1BM shutters |
MOM |
Zone A AA |
0900-1000 |
Vibration measurements |
Emery Mohsen |
Zone A AA |
0930-1130 |
PAR RF reference reconfiguration |
Berenc |
No Injection |
1130-1230 |
Install impedance matching networks |
Brill |
Access Zone F |
1130-1230 |
Vibration measurement, if possible |
Emery Mohsen |
Access Zone F |
1230-1315 |
Close tunnels and power up |
Ops |
No beam |
1230-1530 |
Recover PAR after LLRF reconfiguration |
Harkay, Mohsen, Sun, Berenc, Fors |
No beam |
1315 h |
Start SR conditioning. |
Ops |
No beam |
1530-1630 |
Store beam and check the parameters |
Emery |
Stored Beam & Injection |
1530-1630 |
Turn off UPS in sector 40 as a test |
Doktorczyk |
Stored Beam & Injection |
1630-1900 |
BLS at 550 kV with ramping up to 130 mA. Training in operations (Emery, Fystro, Berkland). |
Uli |
Stored Beam & Injection |
1900-2100 |
IETS-BAM! setup |
Wienands |
Stored Beam & Injection |
1900-2000 |
Septum FF study |
Mohsen |
Stored Beam & Injection |
2100-2300 |
BCM ADC linearity and reflection measurements |
Borland Cheng |
Stored Beam & Injection |
2300-0300 |
Lifetime vs total current at constant bunch charge |
Borland Wienands |
Stored Beam & Injection |
|
Tuesday October 15, 2024 |
|
|
2300-0300 |
Lifetime vs total current at constant bunch charge (continued) |
Borland Wienands |
Stored Beam & Injection |
0300-0500 |
MOFB at higher rate for 30-Hz source localization |
Borland Emery |
Stored Beam & Injection |
0400-0600 |
Injector training (18-06) |
Ops |
Stored Beam & Limited Injection |
0600-0900 |
Injector training (06-18) |
Ops |
Stored Beam & Limited Injection |
0800-0900 |
Upgrade firmware on Accel T3 switch swsr04 to resolve a switch over-temperature issue in sector 4 |
Westbrook |
No Stored Beam & No Injection |
0800-0900 |
Libera bpm recovery after firmware upgrade of a network switch in S4. This would result in a beam dump |
Weixing |
No Stored Beam & No Injection |
0900-1200 |
Test F3 rad monitor |
Harkay et al |
No Stored Beam & No Injection |
0900-1300 |
RG1 study |
Yin-e |
No Stored Beam & No Injection |
1300-1400 |
Check SR 130 mA again |
Emery |
Stored Beam & Injection |
1400-1500 |
Check masking of ID gap inputs |
Smith, Bui Shang |
Stored Beam & Injection |
1500-1600 |
ID optimization checkout |
Shang |
Stored Beam & Injection |
1600-1700 |
Open |
|
|
1700-2100 |
Tune notch spectrum study |
Kallakuri |
Stored Beam & Injection |
2100-2400 |
48-bunch mode trials with 75-100 mA |
Emery |
Stored Beam & Injection |
|
Wednesday October 15, 2024 |
|
|
0000-0300 |
Open |
|
|
0300-0600 |
Injector training (18-06) |
Ops |
Stored Beam & Limited Injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam and injection |