Machine Studies

Draft Schedule for Run03-2, 2024

October 14 0800 – October 16 0800



Time

Descriptions

Studiers

SR Status


Monday, October 14, 2024



0800-0900

Reboot sioc2mofbagg

Arnold

No Beam

0800-0900

Power cycle Liberas in sector 3-4. Follow up on problem of 0200h Sunday

Brill

No Beam

0800-0900

TBTDAQ IOC update

Chandler

No Beam

0800-0900

Test H-coll

Grass

No Beam

0800-0900

Test bi-polar PS comm loss

Fors

No Beam

0800-0930

Injector training

Ops

Limited Injection

0800-1000

Linac K2 shutdown

Meyer

No Beam

0800-1000

Test gap switch PEM

Berkland, Shang

No Beam

0800-1000

Reboot ioc2s40ctrl1

Hong

No Beam

0800-1000

Test AGC control

DiMonte

No Beam

0900-1000

Unlock 1BM shutters

MOM

Zone A AA

0900-1000

Vibration measurements

Emery Mohsen

Zone A AA

0930-1130

PAR RF reference reconfiguration

Berenc

No Injection

1130-1230

Install impedance matching networks

Brill

Access Zone F

1130-1230

Vibration measurement, if possible

Emery Mohsen

Access Zone F

1230-1315

Close tunnels and power up

Ops

No beam

1230-1530

Recover PAR after LLRF reconfiguration

Harkay, Mohsen, Sun, Berenc, Fors

No beam

1315 h

Start SR conditioning.

Ops

No beam

1530-1630

Store beam and check the parameters

Emery

Stored Beam & Injection

1530-1630

Turn off UPS in sector 40 as a test

Doktorczyk

Stored Beam & Injection

1630-1900

BLS at 550 kV with ramping up to 130 mA. Training in operations (Emery, Fystro, Berkland).

Uli

Stored Beam & Injection

1900-2100

IETS-BAM! setup

Wienands

Stored Beam & Injection

1900-2000

Septum FF study

Mohsen

Stored Beam & Injection

2100-2300

BCM ADC linearity and reflection measurements

Borland Cheng

Stored Beam & Injection

2300-0300

Lifetime vs total current at constant bunch charge

Borland Wienands

Stored Beam & Injection


Tuesday October 15, 2024



2300-0300

Lifetime vs total current at constant bunch charge (continued)

Borland Wienands

Stored Beam & Injection

0300-0500

MOFB at higher rate for 30-Hz source localization

Borland Emery

Stored Beam & Injection

0400-0600

Injector training (18-06)

Ops

Stored Beam & Limited Injection

0600-0900

Injector training (06-18)

Ops

Stored Beam & Limited Injection

0800-0900

Upgrade firmware on Accel T3 switch swsr04 to resolve a switch over-temperature issue in sector 4

Westbrook

No Stored Beam & No Injection

0800-0900

Libera bpm recovery after firmware upgrade of a network switch in S4. This would result in a beam dump

Weixing

No Stored Beam & No Injection

0900-1200

Test F3 rad monitor

Harkay et al

No Stored Beam & No Injection

0900-1300

RG1 study

Yin-e

No Stored Beam & No Injection

1300-1400

Check SR 130 mA again

Emery

Stored Beam & Injection

1400-1500

Check masking of ID gap inputs

Smith, Bui Shang

Stored Beam & Injection

1500-1600

ID optimization checkout

Shang

Stored Beam & Injection

1600-1700

Open



1700-2100

Tune notch spectrum study

Kallakuri

Stored Beam & Injection

2100-2400

48-bunch mode trials with 75-100 mA

Emery

Stored Beam & Injection


Wednesday October 15, 2024



0000-0300

Open



0300-0600

Injector training (18-06)

Ops

Stored Beam & Limited Injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam

and injection