October 28 0800 – October 29 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 28, 2024 |
|
|
0800-1600 |
MCC-R2 Shutdown |
Doktorczyk/Scheck |
RF1 and RF2 off and Booster off |
0800-0900 |
Prepare for Zone E Access |
OPS/FAC |
No Beam |
0800-1500 |
Install AC Line Motor System/Meter in M1 power supply |
Puttkammer |
No Beam |
0800-0900 |
HCOLL controller chassis update and reboot all camera IOCs |
Wang |
No Beam |
0900-1100 |
Prepare for Zone A, B, C, and F Access |
OPS/FAC |
No Beam |
0900-1300 |
Zone E access to install S35 ID and unlock 31ID FE shutter/PSS end to end test |
MD Group/SI |
No Beam |
0900-1100 |
DCCT Study |
Wang |
No Beam |
0900-1000 |
Implement swap-out run control in IOC |
Arnold |
No Beam |
0900-1000 |
Investigate MPS fault reset with IDs in Zone D closed |
M. Smith |
No Beam |
0900-1000 |
Swap failed amplifier in Sector 38 on mezzanine |
Diag group |
No Beam |
0900-1000 |
Install heliax cables in Sector 35 on mezzanine |
Weghorn |
No Beam |
1000-1400 |
Upgrade unipolar PS controller firmware |
Kreps |
No Beam |
1100-1500 |
Zone A access to repair encoders for 7ID and unlock 2BM FE shutter/PSS end to end tests |
MD Group/SI |
Zone A AA |
1100-1300 |
Collect vibration data on vacuum chambers in candidate sectors |
Preissner Mohsen Emery |
Zones ABC AA |
1100-1300 |
Change pump speed during vibration measurements (in parallel with above) |
Bracken (MOM) |
Zones ABC AA |
1100-1500 |
Zone B access to unlock 14ID FE shutter/PSS end to end tests |
MD Group/SI |
Zone B AA |
1100-1500 |
Zone C access to repair encoders 21ID |
MD Group/SI |
Zone C AA |
1100-1300 |
Zone F access to remove matching networks and install combiner on bpm |
Brill |
Zone F CA |
1100-1300 |
Zone F; Check the optical alignment of the 35-BM front end optical transport |
Wootton |
Zone F CA |
1100-1200 |
Prepare for Linac Access |
OPS/FAC |
Zones ABC AA |
1200-1300 |
Linac access to install ferrites on Linac BESOCM |
Keane |
Zones ABC AA |
1300-1400 |
Recover Linac from access |
OPS/FAC |
Zones ABC AA |
1400-1600 |
Test unipolar power supply firmware updates (if possible) |
Kreps |
Zones ABC AA |
1500-1700 |
Recover Storage Ring magnets |
OPS/FAC |
|
1600-1700 |
Recover Booster from MCC shutdown |
OPS |
|
1700-1800 |
Recover Storage Ring beam (140 mA) |
Emery |
Stored Beam & Injection |
1800-2000 |
Booster tune measurement fix (parasitic) |
Calvey Fors Dimonte |
Stored Beam & Injection |
1800-2100 |
Optics correction after change in SR conditioning sequence. |
Emery Soliday |
Stored Beam & Injection |
1800-2100 |
Parasitic measurement of septum leakage field waveform when beam is stored |
Borland |
Stored Beam & Injection |
2000-2400 |
PAR and booster high charge studies (possible incomplete overlap with stored SR beam at the beginning) |
Calvey, Harkay Mohsen |
Stored Beam & Injection |
|
Tuesday October 29, 2024 |
|
|
0000-0400 |
Study MOFB with smaller number of BPMs (160, 80, 40), higher rates, and few singular values for 30 Hz motion correction |
Borland, Emery, Chandler, Arnold |
Stored Beam & Injection |
0400-0800 |
ID perturbation measurement |
Emery Shang |
Stored Beam and No Injection |
0800-1100 |
Test slow beam abort (SBA) on IETS |
Paskvan |
No Beam |
0800-1100 |
DCCT Study #2 |
Wang |
No Beam |
0800-1000 |
Storage Ring Power Supply PEM testing |
Berkland/Fystro |
No Beam |
0900-1100 |
Move InjTime PAR fundamental upstream of LIST phase shifter. |
Fors/Harkay |
No Beam and No Injection |
1100-1300 |
Test Booster and Storage Ring injection after PAR fundamental work |
Fors |
Stored Beam & Injection |
1300-2100 |
Switch LFB between phase sensing using differentiator FIR and energy sensing |
Kallakuri Lindberg Emery |
Stored Beam & Injection |
2100-2400 |
Ramping current up to 150 mA with BLS tuning by Joel |
Emery Fuerst |
Stored Beam & Injection |
|
|
|
|
0000-0400 |
Systematic study of single-bunch lifetime vs BLS voltage. |
Borland. Fuerst |
Stored Beam and No Injection |
0400-0600 |
160-corrector response matrix with new optics (10 mA) |
Emery |
Stored Beam and No Injection |
0600-0800 |
Prepare for beamline studies |
OPS |
Stored Beam & Injection |