Schedule for Run03-5, 2024

November 4 0800 – November 5 0800



Time

Descriptions

Studiers

SR Status


Monday, November 4, 2024



0800-0900

Test IEX software

Smith

No Beam

0800-0900

Test gap PEMs

Shang

No Beam

0800-0900

HCOLL chassis update

Grass

No Beam

0800-1200

Run MRF heliax cables

Kisbaugh

No Impact

0830-0930

Install module at K5

DiMonte

No Injection

0900-1100

Switchgear J-1,2,3 inspections

Doktorcyzk

No Injection Bldg 411, 412, 413 on emergency power

0900-1100

Adjust HET stop air/solenoids

Hoyt

Access Booster

0900-1100

DCCT DMM2 and DMM3 setup

Grass

No Beam

0930-1230

Update iocbtune

DiMonte

Limited Injection

1100-1300

Recover injectors/Training

Fystro/OPS

Limited Injection

1300-1500

Implement SR optics correction

Emery

Stored beam & Injection

1300-1500

Kicker noise on the LTP, PTB and L5:CM1 current monitors

Keane

Stored beam & Injection

1500-1900

LFB tuning

Wienands Kallakuri

Stored beam & Injection

1900-2100

BLS voltage to 600 kV, conditional on previous LFB study. Ramp up to 160 mA?

Wienands Kallakuri

Stored beam & Injection

1900-2100

Lifetime versus BLS voltage (back-up study if above is canceled)

Borland

Stored beam & Injection

2100-0100

Injector high charge studies

Calvey, Harkay, Sun, Mohsen

Stored beam & Injection


Tuesday November 5, 2024



0100-0300

(18-06) Injector training

Ops

Limited Injection

0300-0500

Software testing (badger) on injectors (can work with ID perturbation scan)

Mohsen

Stored beam & Limited Injection

0300-0500

ID perturbation scan

Emery Shang

Stored beam & Injection

0500-0600

160-corrector response matrix with new optics (10 mA)

Emery

Stored beam & Injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & Injection