Schedule for Run03-5, 2024
November 4 0800 – November 5 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 4, 2024 |
|
|
0800-0900 |
Test IEX software |
Smith |
No Beam |
0800-0900 |
Test gap PEMs |
Shang |
No Beam |
0800-0900 |
HCOLL chassis update |
Grass |
No Beam |
0800-1200 |
Run MRF heliax cables |
Kisbaugh |
No Impact |
0830-0930 |
Install module at K5 |
DiMonte |
No Injection |
0900-1100 |
Switchgear J-1,2,3 inspections |
Doktorcyzk |
No Injection Bldg 411, 412, 413 on emergency power |
0900-1100 |
Adjust HET stop air/solenoids |
Hoyt |
Access Booster |
0900-1100 |
DCCT DMM2 and DMM3 setup |
Grass |
No Beam |
0930-1230 |
Update iocbtune |
DiMonte |
Limited Injection |
1100-1300 |
Recover injectors/Training |
Fystro/OPS |
Limited Injection |
1300-1500 |
Implement SR optics correction |
Emery |
Stored beam & Injection |
1300-1500 |
Kicker noise on the LTP, PTB and L5:CM1 current monitors |
Keane |
Stored beam & Injection |
1500-1900 |
LFB tuning |
Wienands Kallakuri |
Stored beam & Injection |
1900-2100 |
BLS voltage to 600 kV, conditional on previous LFB study. Ramp up to 160 mA? |
Wienands Kallakuri |
Stored beam & Injection |
1900-2100 |
Lifetime versus BLS voltage (back-up study if above is canceled) |
Borland |
Stored beam & Injection |
2100-0100 |
Injector high charge studies |
Calvey, Harkay, Sun, Mohsen |
Stored beam & Injection |
|
Tuesday November 5, 2024 |
|
|
0100-0300 |
(18-06) Injector training |
Ops |
Limited Injection |
0300-0500 |
Software testing (badger) on injectors (can work with ID perturbation scan) |
Mohsen |
Stored beam & Limited Injection |
0300-0500 |
ID perturbation scan |
Emery Shang |
Stored beam & Injection |
0500-0600 |
160-corrector response matrix with new optics (10 mA) |
Emery |
Stored beam & Injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & Injection |