Machine Studies
Schedule for Run25-1, 2025
January 20th 0800 – January 27th, 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, January 20, 2024 |
|
|
0800-0900 |
1 mA in ring, correct BTS trajectory and correct SR orbit; MPS validation with beam |
Emery, Ops |
Stored Beam & Injection |
0900-1200 |
BM BPLD software checkout and validations. 10 mA |
Bui, Shang |
Stored Beam & Injection |
1200-1300 |
Response matrix for LOCO |
Emery |
Stored Beam & Injection |
1300-1600 |
Horizontal collimator position adjustment with POMO data , single bunch |
Borland |
Stored Beam & Injection |
1600-2400 |
RF conditioning with beam - 162 bunches, ID gaps closed, higher rf voltage, BLS running. Target 200 mA |
Emery, Ops, Berenc, M. Kelly |
Stored Beam & Injection |
1600-1700 |
Check BLS quench protection |
Berenc |
Stored Beam & Injection |
1600-1700 |
Verify logging of PSD; check orbit stability |
Borland |
Stored Beam & Injection |
1600-1800 |
TFB functionality check |
Diag group |
Stored Beam & Injection |
|
Tuesday, January 21, 2024 |
|
|
0000-0400 |
RF conditioning with beam - 162 bunches, ID gaps closed, higher rf voltage, BLS running. Target 200 mA |
Emery, Ops, Berenc, M. Kelly |
Stored Beam & Injection |
0400-0800 |
RG2 beam tune up for injection to PAR |
Y. Sun |
Stored Beam & No Injection |
0800-1000 |
Booster general tuning |
Calvey |
Stored Beam & No Injection |
0800-1000 |
SR LB+ check after switching to SD card booting |
Cheng |
Stored Beam & No Injection |
0900-1000 |
BEFI checkout with beam |
Gustavo |
Stored Beam & No Injection |
1000-1400 |
PAR high Charge |
Mohsen Calvey |
Stored Beam & No Injection |
1400-1800 |
Booster rf parameter adjustment |
Berenc, Calvey, Mohsen |
Stored Beam & No Injection |
1800-2200 |
Booster high charge |
Calvey, Mohsen |
Stored Beam & No Injection |
2200-2400 |
Look at BTS trajectory with new BTS dipole supplies |
Emery |
Stored Beam & Injection |
|
Wednesday, January 22, 2024 |
|
|
0000-0700 |
FOK y-displacement measurement in pinger mode |
Dooling |
Stored Beam & Injection |
0700-0800 |
PAR kicker noise 1 h on LTP monitor no beam |
Keane |
Stored Beam & No Injection |
0800-1200 |
Septum LFC tuning. Multi-bunch, injection on demand |
Borland |
Stored Beam & Injection |
1200-1600 |
ID BPLD validations |
Bui, Shang |
Stored Beam & Injection |
1600-1800 |
Testing of MPS/BPLD partial beam loss detection |
Cheng |
Stored Beam & No Injection |
1800-2400 |
LFB optimization with the CAV1 reinstalled |
Diag group |
Stored Beam & No Injection |
|
Thursday, January 23, 2024 |
|
|
0000-0800 |
Open |
Weixing |
Stored Beam & Injection |
0800-1000 |
SR hands on training |
Emery, COs |
Stored Beam & Injection |
1000-1400 |
LOCO correction |
Sajaev, Emery |
Stored Beam & Injection |
1400-1600 |
Bunch length measurement from button BPM signal |
Cheng |
Stored Beam & Injection |
1600-1800 |
Characterization of BCM nonlinearity at high bunch currents |
Cheng |
Stored Beam & Injection |
1800-2200 |
Orbit feedback studies to simulate local FOFB with MOFB |
Carwardine, Kallakuri |
Stored Beam & Injection |
2200-2400 |
Open |
|
Stored Beam & Injection |
|
Friday, January 24, 2024 |
|
|
0000-0800 |
Open |
Weixing |
Stored Beam & Injection |
0800-1200 |
Open for now, in case an access is needed |
|
Stored Beam & Injection |
1200-1800 |
Lifetime vs chromaticity. High charge per bunch. |
Borland |
Stored Beam & Injection |
1800-2100 |
Synchronous phase measurement |
Cheng |
Stored Beam & Injection |
2100-2400 |
Open |
|
Stored Beam & No Injection |
|
Saturday, January 25, 2024 |
|
|
0000-0800 |
Open |
|
Stored Beam & Injection |
0800-1400 |
PAR Harmonic high voltage study |
Mohsen, Calvey |
Stored Beam & Injection |
1400-2000 |
RG1 rf conditioning and beam commissioning |
Y. Sun |
Stored Beam & Injection |
2000-2300 |
Spark ERXR fine timing adjustment and optimization |
Cheng |
Stored Beam & Injection |
2300-2400 |
Open |
|
Stored Beam & Injection |
|
Sunday, January 26, 2024 |
|
|
0000-0800 |
Open |
|
Stored Beam & Injection |
0800-1200 |
ID gap feedforward |
Emery |
Stored Beam & Injection |
1200-1800 |
X-ray bpm checkout |
Diag group |
Stored Beam & Injection |
1800-2400 |
Open |
|
Stored Beam & Injection |
|
Monday, January 27, 2024 |
|
|
0000-0600 |
Open |
|
Stored Beam & Injection |
0600-0800 |
Prepare for User Beam Operations 160 mA (?) – 162 bunches |
OPS |
Stored Beam & Injection |