Time
|
Descriptions
|
Studiers
|
SR Status
|
|
Monday,
April
7,
2025
|
|
|
0830-0900
|
Reboot
siocrunctrl2
|
Xu
|
No Beam
|
0830-1030
|
Install
unipolar standardization script
|
B. Chandler
|
No Beam
|
0830-1030
|
PS Group work
|
Puttkammer
|
No Beam
|
0830-1030
|
Test RF-2 digital LLRF
on S36C1 with RF on low power
|
Madden
|
No Beam
|
0830-1030
|
Investigate
IETS trigger fiber between MCR and S39 IK rack
|
Forx
|
No Beam
|
0845-0930
|
5BM
PSS End to End test
|
SI Group
|
No Beam
|
0845-1030
|
Unlock
and test shutters at 15ID
|
McNamara
|
Access Zone B
|
0900-1000
|
PC Gun RF cable mapping
|
Berenc
|
Access Linac
|
0900-1000
|
Troubleshoot ITS Linac
RF interface
|
Lenner
|
No Injection
|
0900-1100
|
Replace
leaking flag actuator
|
Kishbaugh
|
Access Linac
|
0900-1100
|
Replace
leaking flag actuator/Cable ID
|
Erwin/Diag Group
|
Access ITS
|
1000-1200
|
Calibrate PAR LLRF tuner
|
Berenc
|
No Injection
|
1100-1400
|
Recover SR &
Injectors/test calibration script
|
Ops/Chandler
|
Stored Beam &
Injection
|
|
|
|
|
1200-1600
|
RG2 beam tune up
|
Sun
|
No Injection
|
1600-2000
|
RF12 high voltage study
|
Mohsen
|
Limited Injection
|
2000-2400
|
Booster high charge
studies
|
Calvey Mohsen Shang
|
Limited Injection
|
|
Tuesday
April 8,
2025
|
|
|
0000-0400
|
LFB drive/damp HOM
measurements.
|
Kallakuri
|
Stored Beam &
Injection
|
0400-0700
|
Characterize effect of
SR magnet cycling on tunes,orbit, etc
|
Emery
|
Stored Beam &
Injection
|
0700-1100
|
Measure kicker timing
shift with voltage
|
Borland Carwardine
|
Stored Beam &
Injection
|
1100-1300
|
Measure DA using IK1
including collection of SPARK data and kicker timing feedforward
|
Borland
|
Stored Beam &
Injection
|
1300-1500
|
Injector training
(08-18)
|
Ops
|
Limited Injection
|
1500-1800
|
RG2 magnets scan data
collect for hysteresis study
|
Shang, Mohsen, Sun
|
Stored Beam &
Injection
|
1800-2000
|
SR Injection Efficiency
Optimization with knobs
|
Shang, Emery
|
Stored Beam &
Injection
|
2000-2200
|
open
|
|
Stored Beam &
Injection
|
2200-2400
|
Injector training
(18-06)
|
Ops
|
Limited Injection
|
|
Wednesday
April 9,
2025
|
|
|
0000-0300
|
Setup 48 bunches, fine
tune injection trajectory, measure chromaticity, etc.
|
Emery
|
Stored Beam &
Injection
|
0300-0600
|
Correct coupling for
reference
|
Emery
|
Stored Beam &
Injection
|
0600-0800
|
Recover SR
systems/prepare for user beam
|
Ops
|
Stored Beam and
Injection
|